Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
73,780
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0193 # 04 Y:1986 | 04 | 1986 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,168 | $0 | Implemented |
UD0193 # 05 Y:1986 | 05 | 1986 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,134 | $21,000 | Implemented |
UD0194 # 01 Y:1986 | 01 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,611 | $12,000 | Implemented |
UD0194 # 02 Y:1986 | 02 | 1986 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,065 | $1,160 | Implemented |
UD0194 # 03 Y:1986 | 03 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,063 | $1,000 | Implemented |
UD0194 # 04 Y:1986 | 04 | 1986 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $3,352 | $1,500 | Implemented |
UD0195 # 01 Y:1986 | 01 | 1986 | USE STEAM SPARGING OR INJECTIONS IN PLACE OF INDIRECT HEATING | $10,751 | $0 | Implemented |
UD0195 # 02 Y:1986 | 02 | 1986 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $418 | $0 | Implemented |
ST0054 # 01 Y:1986 | 01 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,436 | $100 | Implemented |
ST0054 # 02 Y:1986 | 02 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,374 | $0 | Implemented |
ST0054 # 03 Y:1986 | 03 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,651 | $537 | Implemented |
ST0054 # 04 Y:1986 | 04 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,335 | $2,057 | Implemented |
ST0054 # 06 Y:1986 | 06 | 1986 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $139,451 | $20,000 | Implemented |
ST0055 # 01 Y:1986 | 01 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,705 | $571 | Implemented |
ST0055 # 02 Y:1986 | 02 | 1986 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $731 | $0 | Implemented |
ST0055 # 03 Y:1986 | 03 | 1986 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $5,219 | $10,500 | Implemented |
ST0055 # 04 Y:1986 | 04 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $417 | $250 | Implemented |
ST0055 # 05 Y:1986 | 05 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $626 | $0 | Implemented |
ST0055 # 06 Y:1986 | 06 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,030 | $3,750 | Implemented |
ST0055 # 07 Y:1986 | 07 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $834 | $2,400 | Implemented |
TN0275 # 06 Y:1986 | 06 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,571 | $1,300 | Implemented |
TN0276 # 01 Y:1986 | 01 | 1986 | INSULATE BARE EQUIPMENT | $4,831 | $95 | Implemented |
TN0276 # 02 Y:1986 | 02 | 1986 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $1,382 | $0 | Implemented |
TN0276 # 04 Y:1986 | 04 | 1986 | INSULATE BARE EQUIPMENT | $566 | $1,851 | Implemented |
TN0276 # 06 Y:1986 | 06 | 1986 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $373 | $500 | Implemented |