IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73,169

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0004 # 08 Y:1984 08 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $785 $45 Implemented
GT0219 # 01 Y:1984 01 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,420 $2,400 Implemented
GT0219 # 02 Y:1984 02 1984 INSTALL TIMERS AND/OR THERMOSTATS $4,440 $6,000 Implemented
GT0219 # 04 Y:1984 04 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,330 $295 Implemented
GT0220 # 02 Y:1984 02 1984 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $986 $1,840 Implemented
GT0220 # 03 Y:1984 03 1984 INSTALL TIMERS AND/OR THERMOSTATS $4,170 $3,000 Implemented
GT0220 # 04 Y:1984 04 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $301 $640 Implemented
GT0220 # 05 Y:1984 05 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $76 $150 Implemented
GT0221 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,817 $500 Implemented
GT0221 # 05 Y:1984 05 1984 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $11,160 $10,000 Implemented
GT0221 # 08 Y:1984 08 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,700 $3,780 Implemented
GT0231 # 01 Y:1984 01 1984 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $35,206 $60,000 Implemented
GT0231 # 04 Y:1984 04 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $570 $102 Implemented
KU0129 # 03 Y:1984 03 1984 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,368 $3,000 Implemented
KU0129 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,366 $0 Implemented
KU0129 # 05 Y:1984 05 1984 INSTALL TURBULATORS $7,337 $2,000 Implemented
KU0129 # 06 Y:1984 06 1984 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $4,922 $3,000 Implemented
KU0129 # 09 Y:1984 09 1984 INCREASE AMOUNT OF CONDENSATE RETURNED $2,264 $2,500 Implemented
KU0129 # 10 Y:1984 10 1984 SHUT OFF STEAM TRAPS ON SUPER HEATED STEAM LINES WHEN NOT IN USE $5,557 $300 Implemented
KU0129 # 12 Y:1984 12 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,428 $3,565 Implemented
KU0129 # 13 Y:1984 13 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,710 $960 Implemented
KU0129 # 15 Y:1984 15 1984 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $495 $500 Implemented
KU0129 # 16 Y:1984 16 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $283 $120 Implemented
KU0130 # 04 Y:1984 04 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,121 $0 Implemented
KU0130 # 05 Y:1984 05 1984 IMPROVE LUBRICATION PRACTICES $6,312 $600 Implemented