IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73,772

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0016 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,538 $136 Implemented
ST0016 # 03 Y:1985 03 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $939 $700 Implemented
ST0016 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,817 $1,597 Implemented
ST0016 # 06 Y:1985 06 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,005 $0 Implemented
ST0016 # 07 Y:1985 07 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,643 $378 Implemented
ST0020 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,174 $532 Implemented
ST0020 # 02 Y:1985 02 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $101 $0 Implemented
ST0020 # 03 Y:1985 03 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $581 $537 Implemented
ST0020 # 04 Y:1985 04 1985 INSTALL AUTOMATIC STACK DAMPER $886 $1,074 Implemented
ST0020 # 05 Y:1985 05 1985 USE COMPRESSOR AIR FILTERS $1,957 $120 Implemented
ST0020 # 06 Y:1985 06 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,756 $1,900 Implemented
ST0020 # 07 Y:1985 07 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,620 $64 Implemented
ST0020 # 08 Y:1985 08 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,102 $600 Implemented
ST0020 # 09 Y:1985 09 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $723 $278 Implemented
TS0008 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,657 $0 Implemented
TS0008 # 03 Y:1985 03 1985 INSULATE BARE EQUIPMENT $1,200 $3,000 Implemented
TS0008 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,670 $588 Implemented
TS0010 # 01 Y:1985 01 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,024 $1,500 Implemented
TS0010 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $876 $94 Implemented
TS0010 # 03 Y:1985 03 1985 REDUCE VENTILATION AIR $4,602 $460 Implemented
TS0010 # 04 Y:1985 04 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $158 $25 Implemented
TS0012 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $952 $30 Implemented
TS0012 # 03 Y:1985 03 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $13,907 $0 Implemented
TS0012 # 04 Y:1985 04 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,998 $9,765 Implemented
TS0015 # 01 Y:1985 01 1985 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $7,193 $7,000 Implemented