IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72,765

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0044 # 04 Y:1982 04 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,075 $3,000 Implemented
KU0045 # 03 Y:1982 03 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,461 $0 Implemented
KU0045 # 04 Y:1982 04 1982 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,638 $0 Implemented
KU0045 # 05 Y:1982 05 1982 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $659 $200 Implemented
KU0045 # 07 Y:1982 07 1982 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $547 $0 Implemented
KU0045 # 08 Y:1982 08 1982 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $417 $0 Implemented
UD0032 # 01 Y:1982 01 1982 KEEP LAMPS AND REFLECTORS CLEAN $223 $5 Implemented
UD0032 # 02 Y:1982 02 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $617 $3,206 Implemented
UD0032 # 03 Y:1982 03 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $349 $1,141 Implemented
UD0032 # 04 Y:1982 04 1982 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,816 $21,800 Implemented
UD0032 # 05 Y:1982 05 1982 INSTALL STORM WINDOWS AND DOORS $2,478 $6,000 Implemented
UD0033 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,288 $386 Implemented
UD0033 # 02 Y:1982 02 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,030 $3,140 Implemented
UD0033 # 03 Y:1982 03 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $84 $0 Implemented
UD0033 # 04 Y:1982 04 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $872 $250 Implemented
GT0116 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,021 $400 Implemented
GT0116 # 02 Y:1982 02 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,712 $0 Implemented
GT0116 # 03 Y:1982 03 1982 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $1,841 $0 Implemented
GT0116 # 04 Y:1982 04 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,272 $150 Implemented
GT0125 # 01 Y:1982 01 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,931 $1,900 Implemented
GT0125 # 02 Y:1982 02 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,067 $400 Implemented
GT0125 # 03 Y:1982 03 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,124 $6,215 Implemented
GT0125 # 04 Y:1982 04 1982 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $648 $0 Implemented
GT0125 # 05 Y:1982 05 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $748 $359 Implemented
UD0030 # 01 Y:1982 01 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,014 $0 Implemented