Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,643
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0024 # 08 Y:1991 | 08 | 1991 | PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT | $3,287 | $900 | Implemented |
AS0024 # 09 Y:1991 | 09 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,962 | $2,000 | Implemented |
AS0022 # 01 Y:1991 | 01 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $27,958 | $5,100 | Implemented |
AS0022 # 02 Y:1991 | 02 | 1991 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $12,409 | $30,000 | Implemented |
AS0022 # 03 Y:1991 | 03 | 1991 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,189 | $2,775 | Implemented |
AS0022 # 04 Y:1991 | 04 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,153 | $1,500 | Implemented |
AS0022 # 05 Y:1991 | 05 | 1991 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,472 | $1,100 | Implemented |
AS0022 # 06 Y:1991 | 06 | 1991 | INSTALL SET-BACK TIMERS | $2,580 | $2,325 | Implemented |
AS0022 # 07 Y:1991 | 07 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,326 | $50,000 | Implemented |
AS0022 # 08 Y:1991 | 08 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $691 | $550 | Implemented |
AS0022 # 09 Y:1991 | 09 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $448 | $515 | Implemented |
AS0022 # 10 Y:1991 | 10 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $521 | $0 | Implemented |
AS0022 # 11 Y:1991 | 11 | 1991 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $37,471 | $100,000 | Implemented |
AS0021 # 01 Y:1991 | 01 | 1991 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $11,378 | $0 | Implemented |
AS0021 # 02 Y:1991 | 02 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,782 | $18,179 | Implemented |
AS0021 # 03 Y:1991 | 03 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,879 | $0 | Implemented |
AS0021 # 04 Y:1991 | 04 | 1991 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $12,913 | $35,000 | Implemented |
AS0021 # 05 Y:1991 | 05 | 1991 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $90,586 | $400,000 | Implemented |
AS0021 # 06 Y:1991 | 06 | 1991 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $17,386 | $18,000 | Implemented |
AS0021 # 07 Y:1991 | 07 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,885 | $1,000 | Implemented |
AS0021 # 08 Y:1991 | 08 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,180 | $1,760 | Implemented |
AS0021 # 09 Y:1991 | 09 | 1991 | IMPROVE LUBRICATION PRACTICES | $7,796 | $0 | Implemented |
AS0021 # 10 Y:1991 | 10 | 1991 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,246 | $18,000 | Implemented |
AS0021 # 11 Y:1991 | 11 | 1991 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $101,612 | $1,050,000 | Implemented |
AS0019 # 01 Y:1991 | 01 | 1991 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $11,610 | $0 | Implemented |