Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,075

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0170 # 03 Y:1983 03 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $2,800 $7,000 Implemented
TN0170 # 04 Y:1983 04 1983 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $13,230 $4,000 Implemented
TN0180 # 01 Y:1983 01 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $21,000 $600 Implemented
TN0180 # 02 Y:1983 02 1983 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $450 $100 Implemented
TN0180 # 03 Y:1983 03 1983 REDUCE VENTILATION AIR $3,500 $200 Implemented
TN0177 # 02 Y:1983 02 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,540 $400 Implemented
TN0177 # 03 Y:1983 03 1983 USE MINIMUM STEAM OPERATING PRESSURE $2,625 $400 Implemented
TN0179 # 01 Y:1983 01 1983 OPTIMIZE PLANT POWER FACTOR $8,400 $5,000 Implemented
TN0179 # 02 Y:1983 02 1983 INSULATE BARE EQUIPMENT $2,291 $5,700 Implemented
TN0179 # 03 Y:1983 03 1983 USE SOLAR HEAT TO HEAT WATER $826 $24,000 Implemented
TN0183 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,515 $527 Implemented
TN0183 # 02 Y:1983 02 1983 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $9,500 $5,000 Implemented
TN0183 # 03 Y:1983 03 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $3,810 $2,000 Implemented
TN0163 # 03 Y:1982 03 1982 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $500 $0 Implemented
TN0165 # 03 Y:1982 03 1982 INSTALL / REPAIR INSULATION ON STEAM LINES $2,132 $200 Implemented
TN0165 # 04 Y:1982 04 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,920 $500 Implemented
TN0141 # 01 Y:1982 01 1982 INSTALL TIMERS AND/OR THERMOSTATS $3,831 $350 Implemented
TN0141 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $700 $0 Implemented
TN0141 # 03 Y:1982 03 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $113 $50 Implemented
TN0148 # 01 Y:1982 01 1982 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $2,200 $65,000 Implemented
TN0152 # 02 Y:1982 02 1982 INSTALL TIMERS AND/OR THERMOSTATS $5,940 $0 Implemented
TN0152 # 03 Y:1982 03 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,620 $0 Implemented
TN0118 # 01 Y:1982 01 1982 COVER OPEN TANKS $1,586 $120 Implemented
TN0118 # 02 Y:1982 02 1982 INSULATE BARE EQUIPMENT $309 $630 Implemented
TN0118 # 03 Y:1982 03 1982 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,880 $400 Implemented