Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,682
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0281 # 03 Y:2023 | 03 | 2023 | INSTALL OCCUPANCY SENSORS | $1,249 | $804 | Implemented |
IC0281 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,327 | $2,879 | Not Implemented |
IC0281 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $109,160 | $660,787 | Not Implemented |
IC0281 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,262 | $5,407 | Not Implemented |
WM0201 # 01 Y:2023 | 01 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $15,913 | $15,200 | Not Implemented |
WM0201 # 02 Y:2023 | 02 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $7,589 | $2,500 | Not Implemented |
WM0201 # 03 Y:2023 | 03 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,633 | $7,520 | Not Implemented |
WM0201 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,077 | $1,814 | Not Implemented |
WM0201 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $1,042 | $195 | Not Implemented |
MZ0346 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $825 | $2,925 | Implemented |
MZ0346 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $967 | $320 | Not Implemented |
MZ0346 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,048 | $6,536 | Not Implemented |
MZ0346 # 04 Y:2023 | 04 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $425 | $485 | Not Implemented |
MZ0346 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $146 | $200 | Implemented |
IC0274 # 01 Y:2023 | 01 | 2023 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $233 | $359 | Implemented |
IC0274 # 02 Y:2023 | 02 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $73 | $316 | Not Implemented |
IC0274 # 03 Y:2023 | 03 | 2023 | USE POWER DURING OFF-PEAK PERIODS | $24,024 | $0 | Implemented |
IC0274 # 04 Y:2023 | 04 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $49,006 | $1,358,975 | Not Implemented |
IC0273 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,366 | $2,851 | Not Implemented |
IC0273 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,794 | $4,100 | Not Implemented |
IC0273 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $879 | $841 | Not Implemented |
IC0273 # 04 Y:2023 | 04 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $200 | $35 | Not Implemented |
IC0273 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $279,174 | $2,543,426 | Not Implemented |
IC0272 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,198 | $10,487 | Not Implemented |
IC0272 # 02 Y:2023 | 02 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,712 | $3,525 | Implemented |