IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,683

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0298 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,839 $0 Implemented
IC0298 # 07 Y:2024 07 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $352 $0 Implemented
IC0298 # 08 Y:2024 08 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $63 $0 Implemented
IC0298 # 09 Y:2024 09 2024 INSULATE BARE EQUIPMENT $259 $259 Implemented
IC0298 # 10 Y:2024 10 2024 INSULATE BARE EQUIPMENT $18,765 $12,716 Not Implemented
IC0298 # 11 Y:2024 11 2024 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,685 $6,178 Not Implemented
IC0298 # 01 Y:2024 01 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,466 $2,200 Not Implemented
IP0188 # 01 Y:2024 01 2024 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $191,070 $2,400 Not Implemented
IP0188 # 02 Y:2024 02 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $27,927 $2,500 Not Implemented
IP0188 # 03 Y:2024 03 2024 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $20,000 $650 Not Implemented
IP0188 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,293 $2,560 Not Implemented
IP0188 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,737 $750 Not Implemented
IP0188 # 06 Y:2024 06 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,621 $438 Not Implemented
IP0188 # 07 Y:2024 07 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,671 $49 Not Implemented
IP0188 # 08 Y:2024 08 2024 USE RADIANT HEATER FOR SPOT HEATING $4,200 $5,429 Not Implemented
IP0188 # 09 Y:2024 09 2024 USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC $1,660 $947 Not Implemented
IP7010 # 01 Y:2023 01 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $9,650 $4,281 Not Implemented
IP7010 # 02 Y:2023 02 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $18,570 $46,012 Not Implemented
IP7010 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $372 $1,692 Not Implemented
IP7009 # 01 Y:2023 01 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $2,166 $665 Implemented
IP7009 # 02 Y:2023 02 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $470 $325 Implemented
IP7009 # 03 Y:2023 03 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $19,017 $16,650 Not Implemented
IP0187 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,338 $0 Not Implemented
IP0187 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $242 $74 Not Implemented
IP0187 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,797 $42,271 Not Implemented