IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,969

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0163 # 04 Y:1989 04 1989 OPTIMIZE PLANT POWER FACTOR $9,247 $7,253 Not Implemented
MA0163 # 05 Y:1989 05 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,890 $4,255 Not Implemented
MA0163 # 06 Y:1989 06 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,603 $13,662 Not Implemented
MA0164 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,250 $187 Not Implemented
MA0164 # 02 Y:1989 02 1989 INSULATE BARE EQUIPMENT $4,170 $3,456 Not Implemented
MA0164 # 03 Y:1989 03 1989 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $529 $500 Not Implemented
MA0164 # 04 Y:1989 04 1989 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,624 $17,000 Not Implemented
MA0164 # 05 Y:1989 05 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,159 $4,126 Not Implemented
MA0160 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $364 $535 Not Implemented
MA0160 # 02 Y:1989 02 1989 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $434 $0 Implemented
MA0160 # 03 Y:1989 03 1989 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,675 $1,000 Not Implemented
MA0160 # 04 Y:1989 04 1989 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,708 $1,000 Implemented
MA0151 # 01 Y:1989 01 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,228 $426 Not Implemented
MA0151 # 02 Y:1989 02 1989 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,218 $305 Not Implemented
MA0151 # 03 Y:1989 03 1989 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $4,308 $243 Not Implemented
MA0151 # 04 Y:1989 04 1989 BURN A LESS EXPENSIVE GRADE OF FUEL $12,509 $15,150 Implemented
MA0151 # 05 Y:1989 05 1989 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,022 $593 Implemented
MA0151 # 06 Y:1989 06 1989 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $1,093 $592 Not Implemented
MA0151 # 07 Y:1989 07 1989 RECOVER WASTE HEAT FROM EQUIPMENT $2,050 $3,150 Not Implemented
MA0149 # 01 Y:1989 01 1989 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $49,355 $58,020 Not Implemented
MA0149 # 02 Y:1989 02 1989 TURN OFF EQUIPMENT WHEN NOT IN USE $6,037 $0 Not Implemented
MA0149 # 03 Y:1989 03 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $996 $230 Not Implemented
MA0149 # 04 Y:1989 04 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,305 $1,160 Not Implemented
MA0149 # 05 Y:1989 05 1989 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $266 $225 Not Implemented
MA0136 # 01 Y:1989 01 1989 INSTALL SET-BACK TIMERS $422 $892 Implemented