IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0094 # 06 Y:1994 06 1994 USE PHOTOCELL CONTROLS $2,113 $2,400 Not Implemented
UF0094 # 07 Y:1994 07 1994 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,412 $18,200 Not Implemented
UF0094 # 08 Y:1994 08 1994 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $961 $0 Not Implemented
UF0094 # 09 Y:1994 09 1994 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $1,520 $3,200 Not Implemented
UF0094 # 10 Y:1994 10 1994 REDUCE GLAZED AREAS IN BUILDINGS $1,516 $300 Not Implemented
NC0029 # 01 Y:1994 01 1994 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $11,457 $153,000 Not Implemented
NC0029 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,131 $480 Implemented
NC0029 # 03 Y:1994 03 1994 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $14,345 $40,000 Implemented
NC0029 # 04 Y:1994 04 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,050 $520 Not Implemented
NC0029 # 05 Y:1994 05 1994 INSULATE BARE EQUIPMENT $562 $378 Not Implemented
NC0028 # 01 Y:1994 01 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $153 $250 Implemented
NC0028 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,218 $600 Implemented
NC0028 # 03 Y:1994 03 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $787 $240 Not Implemented
NC0028 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $736 $1,510 Implemented
NC0028 # 05 Y:1994 05 1994 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,525 $7,000 Not Implemented
KU0430 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $24,083 $25,905 Not Implemented
KU0430 # 02 Y:1994 02 1994 USE SOLAR HEAT TO HEAT WATER $380 $400 Not Implemented
KU0430 # 03 Y:1994 03 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $321 $334 Not Implemented
KU0430 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $292 $1,088 Implemented
KU0430 # 05 Y:1994 05 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $161 $0 Implemented
KU0430 # 06 Y:1994 06 1994 INSTALL SKYLIGHTS $5,873 $14,300 Not Implemented
KU0430 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,683 $20,936 Not Implemented
KU0430 # 08 Y:1994 08 1994 INSTALL OCCUPANCY SENSORS $1,505 $700 Not Implemented
KU0430 # 09 Y:1994 09 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $429 $544 Not Implemented
WV0037 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $536 $214 Implemented