IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,953

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0098 # 08 Y:1987 08 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,884 $1,333 Implemented
MA0096 # 01 Y:1987 01 1987 INSULATE BARE EQUIPMENT $1,581 $551 Implemented
MA0096 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $402 $78 Implemented
MA0096 # 03 Y:1987 03 1987 RECOVER WASTE HEAT FROM EQUIPMENT $1,922 $746 Implemented
MA0096 # 04 Y:1987 04 1987 INSTALL TIMERS AND/OR THERMOSTATS $715 $450 Not Implemented
MA0096 # 05 Y:1987 05 1987 INSULATE BARE EQUIPMENT $1,966 $1,014 Not Implemented
MA0096 # 06 Y:1987 06 1987 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,391 $893 Not Implemented
MA0096 # 07 Y:1987 07 1987 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $22,563 $4,750 Implemented
MA0096 # 08 Y:1987 08 1987 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,030 $3,900 Not Implemented
MA0090 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,745 $901 Not Implemented
MA0090 # 02 Y:1987 02 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,660 $43 Not Implemented
MA0090 # 03 Y:1987 03 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $943 $0 Not Implemented
MA0090 # 04 Y:1987 04 1987 INSTALL TIMERS AND/OR THERMOSTATS $9,216 $935 Not Implemented
MA0090 # 05 Y:1987 05 1987 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $14,656 $3,520 Not Implemented
MA0090 # 06 Y:1987 06 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $62 $200 Not Implemented
MA0092 # 01 Y:1987 01 1987 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $766 $500 Implemented
MA0092 # 02 Y:1987 02 1987 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,458 $425 Implemented
MA0092 # 03 Y:1987 03 1987 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $28,798 $1,170 Not Implemented
MA0092 # 04 Y:1987 04 1987 INSULATE BARE EQUIPMENT $908 $192 Not Implemented
MA0092 # 05 Y:1987 05 1987 BURN A LESS EXPENSIVE GRADE OF FUEL $2,712 $4,805 Not Implemented
MA0093 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,938 $785 Implemented
MA0093 # 02 Y:1987 02 1987 INSTALL SET-BACK TIMERS $3,744 $450 Not Implemented
MA0093 # 03 Y:1987 03 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $916 $250 Implemented
MA0093 # 04 Y:1987 04 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,650 $0 Implemented
MA0093 # 05 Y:1987 05 1987 UPGRADE OBSOLETE EQUIPMENT $1,429 $4,000 Not Implemented