IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,874

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0272 # 01 Y:1993 01 1993 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,930 $250 Implemented
CO0272 # 02 Y:1993 02 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $980 $350 Not Implemented
CO0272 # 03 Y:1993 03 1993 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $960 $2,500 Implemented
CO0272 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $400 $820 Not Implemented
CO0272 # 06 Y:1993 06 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,950 $10,000 Not Implemented
CO0270 # 01 Y:1993 01 1993 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $2,400 $250 Implemented
CO0270 # 02 Y:1993 02 1993 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $14,790 $16,720 Not Implemented
CO0270 # 03 Y:1993 03 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,020 $2,500 Implemented
CO0270 # 04 Y:1993 04 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,450 $2,850 Implemented
CO0271 # 01 Y:1993 01 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $34,060 $400 Implemented
CO0271 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,640 $400 Implemented
CO0271 # 03 Y:1993 03 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,260 $2,500 Implemented
CO0271 # 04 Y:1993 04 1993 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,240 $8,000 Not Implemented
CO0271 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,634 $37,430 Implemented
CO0268 # 01 Y:1993 01 1993 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $8,550 $250 Implemented
CO0268 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,520 $420 Implemented
CO0268 # 03 Y:1993 03 1993 USE PHOTOCELL CONTROLS $1,050 $1,000 Implemented
CO0268 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,770 $1,000 Implemented
CO0268 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $930 $2,430 Not Implemented
CO0268 # 06 Y:1993 06 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $460 $1,500 Implemented
CO0269 # 01 Y:1993 01 1993 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $920 $200 Implemented
CO0269 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $650 $180 Implemented
CO0269 # 03 Y:1993 03 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $460 $600 Not Implemented
CO0269 # 04 Y:1993 04 1993 RECOVER WASTE HEAT FROM EQUIPMENT $590 $1,100 Not Implemented
CO0269 # 05 Y:1993 05 1993 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $9,350 $17,000 Not Implemented