Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,063
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0184 # 11 Y:2020 | 11 | 2020 | REDUCE VENTILATION AIR | $940 | $0 | Implemented |
DL0184 # 12 Y:2020 | 12 | 2020 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $1,215 | $400 | Implemented |
DL0183 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,743 | $28,900 | Not Implemented |
DL0183 # 02 Y:2020 | 02 | 2020 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $1,766 | $7,900 | Not Implemented |
DL0183 # 03 Y:2020 | 03 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,601 | $19,400 | Not Implemented |
DL0183 # 04 Y:2020 | 04 | 2020 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $68,890 | $420,000 | Implemented |
DL0183 # 05 Y:2020 | 05 | 2020 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $7,082 | $48,700 | Implemented |
DL0181 # 01 Y:2020 | 01 | 2020 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $32,510 | $0 | Implemented |
DL0181 # 02 Y:2020 | 02 | 2020 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $2,480 | $1,500 | Implemented |
DL0181 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,540 | $10,000 | Not Implemented |
DL0181 # 04 Y:2020 | 04 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $4,970 | $6,500 | Not Implemented |
DL0181 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $47,490 | $87,516 | Implemented |
DL0181 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,150 | $3,146 | Implemented |
DL0181 # 07 Y:2020 | 07 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,480 | $10,375 | Implemented |
DL0180 # 01 Y:2020 | 01 | 2020 | REDUCE VENTILATION AIR | $26,710 | $0 | Implemented |
DL0180 # 02 Y:2020 | 02 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $980 | $120 | Implemented |
DL0180 # 03 Y:2020 | 03 | 2020 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $1,450 | $400 | Implemented |
DL0180 # 04 Y:2020 | 04 | 2020 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,160 | $1,600 | Not Implemented |
DL0180 # 05 Y:2020 | 05 | 2020 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,970 | $5,800 | Not Implemented |
DL0180 # 06 Y:2020 | 06 | 2020 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,050 | $4,000 | Not Implemented |
DL0180 # 07 Y:2020 | 07 | 2020 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $53,460 | $2,400 | Not Implemented |
DL0180 # 08 Y:2020 | 08 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,080 | $1,900 | Implemented |
DL0180 # 09 Y:2020 | 09 | 2020 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $610 | $900 | Implemented |
DL0179 # 01 Y:2020 | 01 | 2020 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $8,390 | $2,500 | Implemented |
DL0179 # 02 Y:2020 | 02 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $7,410 | $6,500 | Not Implemented |