IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,063

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0184 # 11 Y:2020 11 2020 REDUCE VENTILATION AIR $940 $0 Implemented
DL0184 # 12 Y:2020 12 2020 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,215 $400 Implemented
DL0183 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,743 $28,900 Not Implemented
DL0183 # 02 Y:2020 02 2020 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,766 $7,900 Not Implemented
DL0183 # 03 Y:2020 03 2020 RECOVER WASTE HEAT FROM EQUIPMENT $8,601 $19,400 Not Implemented
DL0183 # 04 Y:2020 04 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $68,890 $420,000 Implemented
DL0183 # 05 Y:2020 05 2020 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $7,082 $48,700 Implemented
DL0181 # 01 Y:2020 01 2020 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $32,510 $0 Implemented
DL0181 # 02 Y:2020 02 2020 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $2,480 $1,500 Implemented
DL0181 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,540 $10,000 Not Implemented
DL0181 # 04 Y:2020 04 2020 UPGRADE CONTROLS ON COMPRESSORS $4,970 $6,500 Not Implemented
DL0181 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,490 $87,516 Implemented
DL0181 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,150 $3,146 Implemented
DL0181 # 07 Y:2020 07 2020 RECOVER WASTE HEAT FROM EQUIPMENT $3,480 $10,375 Implemented
DL0180 # 01 Y:2020 01 2020 REDUCE VENTILATION AIR $26,710 $0 Implemented
DL0180 # 02 Y:2020 02 2020 INSTALL TIMERS AND/OR THERMOSTATS $980 $120 Implemented
DL0180 # 03 Y:2020 03 2020 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $1,450 $400 Implemented
DL0180 # 04 Y:2020 04 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,160 $1,600 Not Implemented
DL0180 # 05 Y:2020 05 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,970 $5,800 Not Implemented
DL0180 # 06 Y:2020 06 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,050 $4,000 Not Implemented
DL0180 # 07 Y:2020 07 2020 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $53,460 $2,400 Not Implemented
DL0180 # 08 Y:2020 08 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,080 $1,900 Implemented
DL0180 # 09 Y:2020 09 2020 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $610 $900 Implemented
DL0179 # 01 Y:2020 01 2020 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,390 $2,500 Implemented
DL0179 # 02 Y:2020 02 2020 UPGRADE CONTROLS ON COMPRESSORS $7,410 $6,500 Not Implemented