Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,521
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KS2312 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $53,134 | $373,105 | Not Implemented |
KS2311 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,574 | $6,440 | Implemented |
KS2311 # 02 Y:2023 | 02 | 2023 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $19,596 | $10,708 | Not Implemented |
KS2311 # 03 Y:2023 | 03 | 2023 | INSULATE FEEDWATER TANK | $4,841 | $4,104 | Not Implemented |
KS2311 # 04 Y:2023 | 04 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $13,819 | $3,753 | Not Implemented |
KS2311 # 05 Y:2023 | 05 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,129 | $0 | Not Implemented |
KS2311 # 06 Y:2023 | 06 | 2023 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $66,324 | $627,000 | Not Implemented |
KS2311 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $57,047 | $422,421 | Not Implemented |
GT0964 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $78,169 | $1,850 | Implemented |
GT0964 # 02 Y:2023 | 02 | 2023 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $142,026 | $175,000 | Not Implemented |
GT0964 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,849 | $36,015 | Not Implemented |
GT0964 # 04 Y:2023 | 04 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $18,786 | $50,570 | Implemented |
GT0964 # 05 Y:2023 | 05 | 2023 | OPTIMIZE PLANT POWER FACTOR | $1,788 | $8,500 | Not Implemented |
KS2310 # 01 Y:2023 | 01 | 2023 | USE OPTIMUM THICKNESS INSULATION | $6,101 | $3,005 | Implemented |
KS2310 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,786 | $5,960 | Not Implemented |
KS2310 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,134 | $60 | Not Implemented |
KS2310 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $264 | $236 | Not Implemented |
KS2310 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $4,144 | $13,970 | Not Implemented |
KS2310 # 06 Y:2023 | 06 | 2023 | UPGRADE OBSOLETE EQUIPMENT | $8,217 | $52,431 | Implemented |
KS2310 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $53,035 | $420,746 | Not Implemented |
GT0963 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,639 | $1,850 | Implemented |
GT0963 # 02 Y:2023 | 02 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,457 | $400 | Not Implemented |
GT0963 # 03 Y:2023 | 03 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $725 | $450 | Implemented |
GT0963 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $1,308 | $1,330 | Not Implemented |
GT0963 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,066 | $11,282 | Not Implemented |