IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2201 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,277 $3,687 Implemented
UW2201 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,156 $11,363 Implemented
UW2201 # 03 Y:2022 03 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $9,718 $0 Implemented
OR0738 # 01 Y:2021 01 2021 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $242,489 $81,465 Not Implemented
OR0738 # 02 Y:2021 02 2021 OPTIMIZE PLANT POWER FACTOR $13,131 $8,725 Not Implemented
OR0738 # 03 Y:2021 03 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,831 $1,000 Not Implemented
OR0737 # 01 Y:2021 01 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,782 $0 Not Implemented
OR0737 # 02 Y:2021 02 2021 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $7,614 $0 Not Implemented
OR0737 # 03 Y:2021 03 2021 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,949 $0 Not Implemented
OR0737 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,884 $0 Implemented
OR0737 # 05 Y:2021 05 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,820 $8,556 Implemented
BS0139 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $944 $2,630 Implemented
BS0139 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $929 $200 Implemented
BS0139 # 03 Y:2020 03 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $3,565 $17,520 Not Implemented
BS0138 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,016 $73,500 Not Implemented
BS0138 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $1,344 $270 Not Implemented
BS0138 # 03 Y:2020 03 2020 INSULATE BARE EQUIPMENT $11,555 $51,920 Not Implemented
OR0732 # 01 Y:2020 01 2020 INSULATE BARE EQUIPMENT $26,977 $0 Not Implemented
OR0732 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,378 $0 Implemented
OR0732 # 03 Y:2020 03 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $18,849 $0 Not Implemented
OR0732 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,898 $0 Not Implemented
OR0732 # 05 Y:2020 05 2020 USE SYNTHETIC LUBRICANT $9,084 $0 Not Implemented
OR0732 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,586 $0 Not Implemented
OR0724 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $10,104 $18,004 Not Implemented
OR0724 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,124 $3,891 Not Implemented