IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,871

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0389 # 02 Y:1990 02 1990 CLOSE OFF UNNEEDED STEAM LINES $3,217 $0 Not Implemented
TN0389 # 03 Y:1990 03 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,349 $0 Implemented
TN0389 # 04 Y:1990 04 1990 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $1,071 $2,350 Implemented
TN0389 # 05 Y:1990 05 1990 KEEP LAMPS AND REFLECTORS CLEAN $2,447 $7,125 Implemented
TN0389 # 06 Y:1990 06 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,258 $600 Implemented
TN0389 # 07 Y:1990 07 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,227 $690 Implemented
TN0386 # 01 Y:1989 01 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $17,995 $9,500 Implemented
TN0386 # 02 Y:1989 02 1989 REDESIGN PROCESS $16,823 $3,380 Not Implemented
TN0386 # 03 Y:1989 03 1989 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,664 $0 Implemented
TN0386 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,407 $3,860 Implemented
TN0386 # 05 Y:1989 05 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,143 $0 Not Implemented
TN0386 # 06 Y:1989 06 1989 USE OPTIMUM THICKNESS INSULATION $851 $735 Not Implemented
TN0386 # 07 Y:1989 07 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $659 $500 Implemented
TN0385 # 01 Y:1989 01 1989 INSTALL TIMERS AND/OR THERMOSTATS $4,216 $560 Not Implemented
TN0385 # 02 Y:1989 02 1989 INSULATE BARE EQUIPMENT $3,071 $2,300 Not Implemented
TN0385 # 03 Y:1989 03 1989 KEEP LAMPS AND REFLECTORS CLEAN $8,857 $10,432 Not Implemented
TN0385 # 04 Y:1989 04 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,224 $10,400 Implemented
TN0385 # 05 Y:1989 05 1989 REPAIR AND ELIMINATE STEAM LEAKS $1,210 $380 Implemented
TN0385 # 06 Y:1989 06 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,251 $270 Implemented
TN0385 # 07 Y:1989 07 1989 INSTALL SET-BACK TIMERS $3,648 $0 Implemented
TN0385 # 08 Y:1989 08 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,449 $0 Implemented
TN0385 # 09 Y:1989 09 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $517 $301 Implemented
UD0300 # 01 Y:1989 01 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,966 $0 Not Implemented
UD0300 # 02 Y:1989 02 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,322 $0 Not Implemented
UD0300 # 03 Y:1989 03 1989 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $14,860 $25,000 Not Implemented