IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,776

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0545 # 06 Y:1995 06 1995 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $5,300 $7,640 Not Implemented
TN0545 # 07 Y:1995 07 1995 DISCONNECT BALLASTS $3,079 $0 Implemented
TN0545 # 08 Y:1995 08 1995 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,676 $0 Not Implemented
TN0545 # 09 Y:1995 09 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,957 $1,679 Implemented
TN0545 # 10 Y:1995 10 1995 INSULATE BARE EQUIPMENT $889 $425 Implemented
TN0545 # 11 Y:1995 11 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $85,196 $0 Not Implemented
TN0560 # 01 Y:1995 01 1995 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $354,456 $1,091,000 Not Implemented
TN0560 # 02 Y:1995 02 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,066 $0 Implemented
TN0560 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,912 $9,700 Not Implemented
TN0560 # 04 Y:1995 04 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $1,384 $0 Not Implemented
TN0560 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,811 $669 Not Implemented
TN0560 # 06 Y:1995 06 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,122 $810 Not Implemented
TN0560 # 07 Y:1995 07 1995 MAKE A NEW BY-PRODUCT $265,790 $516,000 Not Implemented
TN0560 # 08 Y:1995 08 1995 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $107,432 $1,120 Not Implemented
TN0560 # 09 Y:1995 09 1995 RECYCLE WASTE INK AND CLEANUP SOLVENT $16,400 $27,400 Implemented
TN0560 # 10 Y:1995 10 1995 USE A RAG RECYCLE SERVICE $2,040 $0 Not Implemented
TN0559 # 01 Y:1995 01 1995 INSTALL TIMERS AND/OR THERMOSTATS $9,785 $5,640 Not Implemented
TN0559 # 02 Y:1995 02 1995 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,680 $12,800 Not Implemented
TN0559 # 03 Y:1995 03 1995 RECOVER WASTE HEAT FROM EQUIPMENT $2,531 $3,600 Not Implemented
TN0559 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,207 $990 Implemented
TN0559 # 05 Y:1995 05 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $17,212 $6,100 Not Implemented
TN0559 # 06 Y:1995 06 1995 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $238,000 $2,250 Implemented
TN0559 # 07 Y:1995 07 1995 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $119,243 $20,200 Not Implemented
TN0559 # 08 Y:1995 08 1995 USE EVAPORATION TO CONCENTRATE MATERIAL $61,296 $75,000 Not Implemented
TN0558 # 01 Y:1995 01 1995 INSULATE BARE EQUIPMENT $4,752 $700 Implemented