IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,713

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0444 # 05 Y:2011 05 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,135 $1,000 Implemented
UF0444 # 06 Y:2011 06 2011 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $1,175 $4,385 Not Implemented
UF0444 # 07 Y:2011 07 2011 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $2,862 $2,729 Not Implemented
UF0444 # 08 Y:2011 08 2011 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $14,978 $39,066 Not Implemented
UF0444 # 09 Y:2011 09 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $616 $0 Not Implemented
UF0444 # 10 Y:2011 10 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,606 $930 Not Implemented
UF0444 # 11 Y:2011 11 2011 COVER OPEN TANKS $9,431 $2,321 Not Implemented
UF0444 # 12 Y:2011 12 2011 INSTALL TURBULATORS $16,282 $7,500 Not Implemented
UF0443 # 01 Y:2011 01 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,607 $0 Implemented
UF0443 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,731 $42,492 Implemented
UF0443 # 03 Y:2011 03 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,454 $38,200 Not Implemented
UF0443 # 04 Y:2011 04 2011 AIR CONDITION ONLY SPACE NECESSARY $4,722 $550 Not Implemented
UF0443 # 05 Y:2011 05 2011 INSTALL TIMERS AND/OR THERMOSTATS $562 $75 Implemented
UF0443 # 06 Y:2011 06 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $19,349 $2,235 Implemented
UF0443 # 07 Y:2011 07 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $106,353 $25,300 Not Implemented
UF0443 # 08 Y:2011 08 2011 REPAIR AND ELIMINATE STEAM LEAKS $156 $370 Not Implemented
UF0443 # 09 Y:2011 09 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $80,522 $8,600 Not Implemented
UF0443 # 10 Y:2011 10 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,822 $670 Not Implemented
MI0209 # 01 Y:2011 01 2011 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $4,297,734 $3,000,000 Implemented
MI0209 # 02 Y:2011 02 2011 HEAT WATER WITH EXHAUST HEAT $240,185 $30,000 Not Implemented
MI0209 # 03 Y:2011 03 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $192,436 $36,000 Not Implemented
MI0209 # 04 Y:2011 04 2011 REPLACE TREATED WATER WITH WELL / SURFACE WATER $132,137 $500,000 Implemented
MI0209 # 05 Y:2011 05 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $112,996 $1,950 Implemented
MI0209 # 06 Y:2011 06 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $107,940 $330,568 Implemented
MI0209 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,204 $29,679 Implemented