Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,342
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LT0071 # 02 Y:1986 | 02 | 1986 | REDUCE EXCESSIVE BOILER BLOWDOWN | $20,288 | $9,000 | Implemented |
LT0071 # 03 Y:1986 | 03 | 1986 | USE OPTIMUM TEMPERATURE | $33,764 | $3,000 | Not Implemented |
LT0071 # 04 Y:1986 | 04 | 1986 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $199,300 | $690,000 | Not Implemented |
LT0071 # 05 Y:1986 | 05 | 1986 | INSTALL / REPAIR INSULATION ON STEAM LINES | $751 | $155 | Implemented |
LT0053 # 01 Y:1986 | 01 | 1986 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,910 | $0 | Implemented |
LT0053 # 02 Y:1986 | 02 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $575 | $0 | Implemented |
LT0053 # 03 Y:1986 | 03 | 1986 | USE OPTIMUM THICKNESS INSULATION | $11,458 | $28,763 | Not Implemented |
LT0053 # 05 Y:1986 | 05 | 1986 | REPAIR AND ELIMINATE STEAM LEAKS | $2,214 | $2,000 | Implemented |
LT0053 # 06 Y:1986 | 06 | 1986 | KEEP BOILER TUBES CLEAN | $1,737 | $3,000 | Not Implemented |
LT0053 # 07 Y:1986 | 07 | 1986 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,600 | $10,000 | Not Implemented |
LT0053 # 08 Y:1986 | 08 | 1986 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $408 | $1,000 | Implemented |
LT0043 # 01 Y:1985 | 01 | 1985 | INSTALL SET-BACK TIMERS | $338 | $0 | Implemented |
LT0043 # 02 Y:1985 | 02 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $901 | $300 | Implemented |
LT0043 # 03 Y:1985 | 03 | 1985 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $1,159 | $200 | Implemented |
LT0043 # 04 Y:1985 | 04 | 1985 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,294 | $412 | Implemented |
LT0043 # 05 Y:1985 | 05 | 1985 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,977 | $0 | Not Implemented |
LT0043 # 06 Y:1985 | 06 | 1985 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $402 | $1,020 | Not Implemented |
LT0043 # 07 Y:1985 | 07 | 1985 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $662 | $0 | Implemented |
LT0044 # 01 Y:1985 | 01 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,544 | $0 | Not Implemented |
LT0044 # 02 Y:1985 | 02 | 1985 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $3,879 | $8,181 | Implemented |
LT0044 # 03 Y:1985 | 03 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,161 | $680 | Implemented |
LT0044 # 04 Y:1985 | 04 | 1985 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,403 | $139 | Not Implemented |
LT0044 # 05 Y:1985 | 05 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $1,121 | $450 | Implemented |
LT0044 # 06 Y:1985 | 06 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $2,627 | $60 | Implemented |
LT0044 # 07 Y:1985 | 07 | 1985 | INSULATE BARE EQUIPMENT | $5,430 | $1,840 | Not Implemented |