Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,718
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0833 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $29,117 | $6,950 | Not Implemented |
MA0833 # 02 Y:2022 | 02 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $10,258 | $840 | Implemented |
MA0833 # 03 Y:2022 | 03 | 2022 | USE HEAT PUMP FOR SPACE CONDITIONING | $5,709 | $2,500 | Implemented |
MA0833 # 04 Y:2022 | 04 | 2022 | USE HEAT PUMP FOR SPACE CONDITIONING | $618 | $94,050 | Implemented |
MI0401 # 01 Y:2022 | 01 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $15,026 | $580 | Implemented |
MI0401 # 02 Y:2022 | 02 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $8,603 | $24,100 | Not Implemented |
MI0401 # 03 Y:2022 | 03 | 2022 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $7,485 | $25,433 | Implemented |
MI0401 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,273 | $1,930 | Implemented |
MI0401 # 05 Y:2022 | 05 | 2022 | METER WASTE WATER | $3,900 | $900 | Not Implemented |
MI0401 # 06 Y:2022 | 06 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,022 | $2,050 | Not Implemented |
MI0401 # 07 Y:2022 | 07 | 2022 | OPTIMIZE PLANT POWER FACTOR | $2,280 | $2,998 | Not Implemented |
AM0840 # 01 Y:2022 | 01 | 2022 | OPTIMIZE PLANT POWER FACTOR | $20,260 | $33,400 | Not Implemented |
AM0840 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,045 | $17,675 | Implemented |
AM0840 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,290 | $1,000 | Implemented |
AM0840 # 04 Y:2022 | 04 | 2022 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $5,480 | $1,710 | Not Implemented |
AM0840 # 05 Y:2022 | 05 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,310 | $750 | Not Implemented |
AM0840 # 06 Y:2022 | 06 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $780 | $50 | Implemented |
AM0840 # 07 Y:2022 | 07 | 2022 | USE SYNTHETIC LUBRICANT | $665 | $450 | Not Implemented |
AM0840 # 08 Y:2022 | 08 | 2022 | INSTALL OCCUPANCY SENSORS | $360 | $260 | Not Implemented |
AM0840 # 09 Y:2022 | 09 | 2022 | USE PHOTOCELL CONTROLS | $170 | $50 | Not Implemented |
AM0840 # 10 Y:2022 | 10 | 2022 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $86 | $179 | Implemented |
CW0121 # 01 Y:2022 | 01 | 2022 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $3,129 | $400 | Implemented |
CW0121 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,231 | $26,058 | Implemented |
CW0121 # 03 Y:2022 | 03 | 2022 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $3,746 | $265 | Implemented |
CW0121 # 04 Y:2022 | 04 | 2022 | CONVERT TO ROBOTIC PAINTING | $93,600 | $33,000 | Not Implemented |