IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,767

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0449 # 01 Y:1992 01 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $51,669 $69,696 Implemented
TN0449 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,239 $18,600 Implemented
TN0449 # 03 Y:1992 03 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,635 $5,425 Implemented
TN0449 # 04 Y:1992 04 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,284 $2,175 Implemented
TN0449 # 05 Y:1992 05 1992 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $8,588 $1,805 Implemented
TN0449 # 06 Y:1992 06 1992 RECOVER WASTE HEAT FROM EQUIPMENT $8,056 $700 Implemented
TN0449 # 07 Y:1992 07 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,404 $700 Implemented
TN0450 # 01 Y:1992 01 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,646 $860 Implemented
TN0450 # 02 Y:1992 02 1992 IMPROVE LUBRICATION PRACTICES $788 $300 Implemented
TN0450 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $414 $316 Implemented
TN0450 # 04 Y:1992 04 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $706 $890 Implemented
TN0450 # 05 Y:1992 05 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,058 $0 Implemented
TN0450 # 06 Y:1992 06 1992 OPTIMIZE PLANT POWER FACTOR $4,400 $9,000 Implemented
TN0443 # 01 Y:1991 01 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,982 $1,500 Not Implemented
TN0443 # 02 Y:1991 02 1991 USE OPTIMUM THICKNESS INSULATION $4,316 $630 Not Implemented
TN0443 # 03 Y:1991 03 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,033 $6,300 Not Implemented
TN0443 # 04 Y:1991 04 1991 USE MINIMUM STEAM OPERATING PRESSURE $1,472 $500 Not Implemented
TN0443 # 05 Y:1991 05 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $747 $390 Not Implemented
TN0443 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,751 $765 Not Implemented
TN0444 # 01 Y:1991 01 1991 USE RADIANT HEATER FOR SPOT HEATING $1,613 $3,410 Implemented
TN0444 # 02 Y:1991 02 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,581 $0 Implemented
TN0444 # 03 Y:1991 03 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $324 $360 Implemented
TN0444 # 04 Y:1991 04 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $133 $60 Implemented
TN0436 # 01 Y:1991 01 1991 INSTALL / REPAIR INSULATION ON STEAM LINES $26,217 $1,204 Implemented
TN0436 # 02 Y:1991 02 1991 REPAIR AND ELIMINATE STEAM LEAKS $9,331 $500 Implemented