IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,150

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0095 # 10 Y:1983 10 1983 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $127 $0 Not Implemented
KU0101 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,002 $600 Not Implemented
KU0101 # 02 Y:1983 02 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $199 $300 Not Implemented
KU0101 # 03 Y:1983 03 1983 INSTALL AUTOMATIC STACK DAMPER $230 $750 Not Implemented
KU0101 # 04 Y:1983 04 1983 SHUT OFF PILOTS IN STANDBY EQUIPMENT $107 $0 Not Implemented
KU0101 # 05 Y:1983 05 1983 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $410 $0 Not Implemented
KU0102 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $612 $1,228 Not Implemented
KU0102 # 02 Y:1983 02 1983 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,389 $4,000 Implemented
KU0102 # 03 Y:1983 03 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,241 $360 Not Implemented
KU0102 # 04 Y:1983 04 1983 INSTALL AUTOMATIC STACK DAMPER $824 $700 Implemented
KU0102 # 05 Y:1983 05 1983 INSTALL TIMERS AND/OR THERMOSTATS $808 $1,200 Not Implemented
KU0102 # 06 Y:1983 06 1983 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $341 $0 Not Implemented
KU0103 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $814 $862 Not Implemented
KU0103 # 02 Y:1983 02 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,030 $100 Not Implemented
KU0103 # 04 Y:1983 04 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $115 $180 Not Implemented
KU0103 # 05 Y:1983 05 1983 INSTALL AUTOMATIC STACK DAMPER $335 $450 Not Implemented
KU0103 # 06 Y:1983 06 1983 SHUT OFF PILOTS IN STANDBY EQUIPMENT $85 $0 Not Implemented
KU0103 # 07 Y:1983 07 1983 INSTALL TIMERS AND/OR THERMOSTATS $1,466 $89 Not Implemented
KU0103 # 08 Y:1983 08 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,369 $200 Not Implemented
KU0103 # 09 Y:1983 09 1983 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $81 $0 Not Implemented
KU0103 # 10 Y:1983 10 1983 INSULATE BARE EQUIPMENT $4,862 $2,500 Not Implemented
KU0104 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,312 $1,500 Implemented
KU0104 # 02 Y:1983 02 1983 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,960 $800 Implemented
KU0104 # 03 Y:1983 03 1983 REPAIR OR REPLACE STEAM TRAPS $2,673 $2,000 Implemented
KU0104 # 04 Y:1983 04 1983 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,624 $400 Implemented