IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,880

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2304 # 07 Y:2023 07 2023 INSTALL OCCUPANCY SENSORS $99 $260 Not Implemented
UC2304 # 08 Y:2023 08 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $79,562 $411,323 Not Implemented
ORC008 # 01 Y:2023 01 2023 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,876 $500 Not Implemented
ORC008 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $474 $100 Not Implemented
ORC008 # 03 Y:2023 03 2023 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $959 $1,500 Not Implemented
ORC008 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,527 $4,000 Not Implemented
ORC008 # 05 Y:2023 05 2023 USE HEAT PUMP FOR SPACE CONDITIONING $668 $5,000 Not Implemented
ORC008 # 06 Y:2023 06 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,574 $500 Not Implemented
NT0005 # 01 Y:2023 01 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,885 $1,258 Not Implemented
NT0005 # 02 Y:2023 02 2023 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $6,240 $0 Not Implemented
NT0005 # 03 Y:2023 03 2023 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $832,000 $100,000 Not Implemented
NT0005 # 04 Y:2023 04 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,375 $6,539 Not Implemented
NT0005 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $4,433 $9,008 Not Implemented
NT0005 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,810 $0 Not Implemented
CI0011 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $11,157 $4,800 Not Implemented
CI0011 # 02 Y:2023 02 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $8,809 $20,000 Not Implemented
CI0011 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,448 $2,393 Not Implemented
CI0011 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $2,298 $0 Not Implemented
CI0011 # 05 Y:2023 05 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,181 $6,150 Not Implemented
CI0011 # 06 Y:2023 06 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,753 $500 Not Implemented
CI0010 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,279 $12,078 Implemented
CI0010 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $13,459 $115,417 Implemented
CI0010 # 03 Y:2023 03 2023 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $7,488 $12,300 Not Implemented
CI0010 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $4,003 $0 Not Implemented
CI0010 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $1,203 $500 Not Implemented