Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,880
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0423 # 10 Y:2023 | 10 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $277 | $1,360 | Implemented |
UW2303 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $687 | $1,488 | Not Implemented |
UW2303 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $590 | $124 | Not Implemented |
UW2303 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,161 | $624 | Not Implemented |
UW2303 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $702 | $959 | Not Implemented |
UW2303 # 05 Y:2023 | 05 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $199 | $282 | Not Implemented |
UW2303 # 06 Y:2023 | 06 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,084 | $5,025 | Not Implemented |
MZ0337 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,895 | $9,731 | Implemented |
MZ0337 # 02 Y:2023 | 02 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,106 | $2,400 | Implemented |
MZ0337 # 03 Y:2023 | 03 | 2023 | USE PHOTOCELL CONTROLS | $314 | $100 | Implemented |
MZ0337 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $330 | $820 | Not Implemented |
MZ0337 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,882 | $6,873 | Implemented |
MZ0337 # 06 Y:2023 | 06 | 2023 | IMPROVE SPACE COMFORT CONDITIONING | $150,000 | $75,650 | Implemented |
UU0218 # 01 Y:2023 | 01 | 2023 | OPTIMIZE PLANT POWER FACTOR | $8,860 | $4,445 | Not Implemented |
UU0218 # 02 Y:2023 | 02 | 2023 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $7,404 | $5,700 | Implemented |
UU0218 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,223 | $53,198 | Implemented |
UU0218 # 04 Y:2023 | 04 | 2023 | DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS | $3,088 | $3,300 | Not Implemented |
UU0218 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $2,944 | $78,979 | Not Implemented |
UU0218 # 06 Y:2023 | 06 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,861 | $721 | Implemented |
UU0218 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $512 | $161 | Implemented |
CI0009 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $46,339 | $196,478 | n/a |
CI0009 # 02 Y:2023 | 02 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $11,591 | $41,000 | n/a |
CI0009 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,199 | $1,500 | n/a |
CI0009 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,281 | $14,880 | n/a |
CI0009 # 05 Y:2023 | 05 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,574 | $0 | n/a |