Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,682
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0252 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,034 | $59,439 | Implemented |
TT0252 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,906 | $150 | Implemented |
TT0252 # 06 Y:2021 | 06 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $1,974 | $1,100 | Not Implemented |
TT0252 # 07 Y:2021 | 07 | 2021 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $1,300 | $2,500 | Not Implemented |
IC0246 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,458 | $4,300 | Not Implemented |
IC0246 # 02 Y:2021 | 02 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $433 | $214 | Not Implemented |
IC0246 # 03 Y:2021 | 03 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $20,948 | $40,000 | Not Implemented |
IC0246 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $3,527 | $1,200 | Not Implemented |
IC0246 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,840 | $544 | Not Implemented |
IC0244 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,228 | $517 | Implemented |
IC0244 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,307 | $4,150 | Implemented |
IC0244 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $732 | $534 | Not Implemented |
IC0244 # 04 Y:2020 | 04 | 2020 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,190 | $6,120 | Not Implemented |
IC0245 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $575 | $517 | Implemented |
IC0245 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,465 | $4,250 | Implemented |
IC0245 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $951 | $801 | Implemented |
IC0245 # 04 Y:2020 | 04 | 2020 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $4,231 | $0 | Implemented |
IC0245 # 05 Y:2020 | 05 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $23,890 | $13,698 | Implemented |
IC0243 # 01 Y:2020 | 01 | 2020 | USE EXISTING DAM TO GENERATE ELECTRICITY | $1,582 | $31,846 | Not Implemented |
IC0243 # 02 Y:2020 | 02 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $37,674 | $140,751 | Implemented |
IC0243 # 03 Y:2020 | 03 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $21,698 | $6,150 | Implemented |
IC0243 # 04 Y:2020 | 04 | 2020 | USE OPTIMUM TEMPERATURE | $24,347 | $0 | Not Implemented |
IC0243 # 05 Y:2020 | 05 | 2020 | SEPARATE TREATMENTS FOR EACH TYPE OF SOLUTION AND RECYCLE | $21,681 | $40,000 | Not Implemented |
IC0243 # 06 Y:2020 | 06 | 2020 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $130,722 | $713,750 | Implemented |
IC0242 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $48,538 | $5,100 | Not Implemented |