Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,055
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0466 # 04 Y:1995 | 04 | 1995 | USE PHOTOCELL CONTROLS | $2,034 | $2,240 | Implemented |
OK0466 # 05 Y:1995 | 05 | 1995 | INSULATE BARE EQUIPMENT | $446 | $1,178 | Implemented |
OR0235 # 01 Y:1995 | 01 | 1995 | ADD AREA LIGHTING SWITCHES | $2,089 | $2,200 | Implemented |
OR0235 # 02 Y:1995 | 02 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,052 | $2,592 | Implemented |
OR0235 # 03 Y:1995 | 03 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $250 | $500 | Implemented |
OR0235 # 04 Y:1995 | 04 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,680 | $4,000 | Implemented |
OR0235 # 05 Y:1995 | 05 | 1995 | USE MULTIPLE-EFFECT EVAPORATORS | $2,900 | $9,500 | Implemented |
OR0235 # 06 Y:1995 | 06 | 1995 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,970 | $8,500 | Not Implemented |
OR0234 # 01 Y:1995 | 01 | 1995 | USE PHOTOCELL CONTROLS | $1,475 | $656 | Not Implemented |
OR0234 # 02 Y:1995 | 02 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,140 | $6,366 | Implemented |
OR0234 # 03 Y:1995 | 03 | 1995 | RECOVER AND REUSE WASTE MATERIAL | $2,660 | $0 | Not Implemented |
OR0234 # 04 Y:1995 | 04 | 1995 | RECYCLE CASTING SAND | $9,746 | $12,960 | Implemented |
OR0234 # 05 Y:1995 | 05 | 1995 | REGENERATE CLEANING SOLVENT ON-SITE AND REUSE | $4,793 | $65,000 | Not Implemented |
NV0029 # 01 Y:1995 | 01 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,805 | $293 | Implemented |
NV0029 # 02 Y:1995 | 02 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $275 | $200 | Implemented |
NV0029 # 03 Y:1995 | 03 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $134 | $56 | Not Implemented |
NV0029 # 04 Y:1995 | 04 | 1995 | USE PHOTOCELL CONTROLS | $822 | $95 | Not Implemented |
NV0029 # 05 Y:1995 | 05 | 1995 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,747 | $2,202 | Not Implemented |
NV0029 # 06 Y:1995 | 06 | 1995 | OPTIMIZE PLANT POWER FACTOR | $755 | $1,020 | Not Implemented |
OR0233 # 01 Y:1995 | 01 | 1995 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $977 | $1,860 | Not Implemented |
OR0233 # 02 Y:1995 | 02 | 1995 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,960 | $0 | Implemented |
OR0233 # 03 Y:1995 | 03 | 1995 | USE IN-PROCESS RECYCLING WHENEVER POSSIBLE | $1,664 | $0 | Not Implemented |
UF0115 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,197 | $919 | Implemented |
UF0115 # 02 Y:1995 | 02 | 1995 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,494 | $4,500 | Not Implemented |
UF0115 # 03 Y:1995 | 03 | 1995 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,819 | $1,500 | Not Implemented |