IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,130

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0054 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,585 $4,022 Not Implemented
UF0054 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $72 $30 Not Implemented
UF0054 # 05 Y:1993 05 1993 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $14,700 $22,000 Implemented
UF0054 # 06 Y:1993 06 1993 REPLACE ELECTRIC REHEAT WITH HEAT PIPES $11,340 $7,000 Not Implemented
UF0054 # 07 Y:1993 07 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $595 $150 Not Implemented
UF0054 # 08 Y:1993 08 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,470 $10,400 Not Implemented
TN0485 # 01 Y:1993 01 1993 RECOVER WASTE HEAT FROM EQUIPMENT $3,219 $3,110 Not Implemented
TN0485 # 02 Y:1993 02 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,103 $1,450 Not Implemented
TN0485 # 03 Y:1993 03 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $5,460 $0 Not Implemented
TN0485 # 04 Y:1993 04 1993 INSTALL TIMERS AND/OR THERMOSTATS $3,403 $2,160 Not Implemented
TN0485 # 05 Y:1993 05 1993 INSULATE BARE EQUIPMENT $633 $627 Not Implemented
TN0485 # 06 Y:1993 06 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $299 $160 Not Implemented
IA0047 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,116 $2,000 Implemented
IA0047 # 02 Y:1993 02 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $71 $50 Implemented
IA0047 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,414 $441 Implemented
IA0047 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $574 $112 Implemented
IA0047 # 05 Y:1993 05 1993 INSTALL OCCUPANCY SENSORS $265 $414 Not Implemented
GT0487 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,660 $5,500 Implemented
GT0487 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,800 $7,560 Implemented
GT0487 # 03 Y:1993 03 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $703 $0 Implemented
GT0487 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $310 $100 Implemented
GT0487 # 05 Y:1993 05 1993 RECOVER WASTE HEAT FROM EQUIPMENT $775 $850 Implemented
GT0487 # 06 Y:1993 06 1993 REPLACE BOILER $6,960 $16,500 Not Implemented
GT0487 # 07 Y:1993 07 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,982 $7,000 Implemented
GT0487 # 08 Y:1993 08 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,940 $0 Implemented