Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,130
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0487 # 09 Y:1993 | 09 | 1993 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $7,530 | $1,000 | Implemented |
GT0487 # 10 Y:1993 | 10 | 1993 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $790 | $0 | Implemented |
AM0173 # 01 Y:1993 | 01 | 1993 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $146,200 | $0 | Not Implemented |
AM0173 # 02 Y:1993 | 02 | 1993 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $18,000 | $0 | Not Implemented |
AM0173 # 03 Y:1993 | 03 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,140 | $8,000 | Implemented |
AM0173 # 04 Y:1993 | 04 | 1993 | REPAIR AND ELIMINATE STEAM LEAKS | $3,670 | $600 | Implemented |
AM0173 # 05 Y:1993 | 05 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $160 | $0 | Implemented |
AM0173 # 06 Y:1993 | 06 | 1993 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $290 | $240 | Implemented |
UD0394 # 01 Y:1993 | 01 | 1993 | REPLACE BOILER | $1,962 | $0 | Not Implemented |
UD0394 # 02 Y:1993 | 02 | 1993 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $334 | $300 | Not Implemented |
UD0394 # 03 Y:1993 | 03 | 1993 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,968 | $0 | Not Implemented |
UD0394 # 04 Y:1993 | 04 | 1993 | ADD AREA LIGHTING SWITCHES | $4,244 | $2,000 | Not Implemented |
CO0261 # 01 Y:1993 | 01 | 1993 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $740 | $80 | Implemented |
CO0261 # 02 Y:1993 | 02 | 1993 | INSTALL TIMERS AND/OR THERMOSTATS | $2,250 | $2,250 | Implemented |
CO0261 # 03 Y:1993 | 03 | 1993 | INSTALL OCCUPANCY SENSORS | $1,200 | $1,200 | Not Implemented |
CO0261 # 04 Y:1993 | 04 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $270 | $200 | Not Implemented |
CO0261 # 05 Y:1993 | 05 | 1993 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $230 | $280 | Implemented |
CO0261 # 06 Y:1993 | 06 | 1993 | RECOVER WASTE HEAT FROM EQUIPMENT | $770 | $2,300 | Not Implemented |
UF0053 # 01 Y:1993 | 01 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,533 | $3,596 | Implemented |
UF0053 # 02 Y:1993 | 02 | 1993 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,538 | $4,770 | Not Implemented |
UF0053 # 03 Y:1993 | 03 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $239 | $812 | Implemented |
UF0053 # 04 Y:1993 | 04 | 1993 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $374 | $565 | Implemented |
UF0053 # 05 Y:1993 | 05 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $12,064 | $20,264 | Implemented |
UF0053 # 06 Y:1993 | 06 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,268 | $1,175 | Implemented |
UF0053 # 07 Y:1993 | 07 | 1993 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $61,857 | $186,150 | Not Implemented |