IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,314

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0058 # 08 Y:1992 08 1992 INSULATE BARE EQUIPMENT $273 $100 Implemented
AS0058 # 09 Y:1992 09 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,036 $3,213 Implemented
AS0058 # 10 Y:1992 10 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $475 $0 Implemented
AS0055 # 01 Y:1992 01 1992 HEAT WATER DURING OFF-PEAK PERIODS AND STORE FOR LATER USE $16,293 $64,125 Not Implemented
AS0055 # 02 Y:1992 02 1992 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $15,736 $68,000 Not Implemented
AS0055 # 03 Y:1992 03 1992 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,959 $10,500 Not Implemented
AS0055 # 04 Y:1992 04 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $961 $2,033 Not Implemented
AS0055 # 05 Y:1992 05 1992 USE OPTIMUM THICKNESS INSULATION $727 $3,700 Not Implemented
AS0055 # 06 Y:1992 06 1992 USE HEAT PUMP FOR SPACE CONDITIONING $15,185 $26,340 Not Implemented
AS0055 # 07 Y:1992 07 1992 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $6,710 $2,400 Not Implemented
AS0055 # 08 Y:1992 08 1992 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $441 $1,200 Not Implemented
AS0055 # 09 Y:1992 09 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,731 $6,791 Not Implemented
AS0055 # 10 Y:1992 10 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $537 $236 Not Implemented
AS0055 # 11 Y:1992 11 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,265 $3,424 Not Implemented
AS0056 # 01 Y:1992 01 1992 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $50,496 $337,500 Not Implemented
AS0056 # 02 Y:1992 02 1992 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $23,380 $240,000 Not Implemented
AS0056 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,081 $43,663 Not Implemented
AS0056 # 04 Y:1992 04 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,817 $0 Not Implemented
AS0056 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $514 $200 Not Implemented
AS0056 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $705 $5,815 Not Implemented
AS0056 # 07 Y:1992 07 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,887 $4,292 Not Implemented
AS0056 # 08 Y:1992 08 1992 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $994 $0 Not Implemented
AS0054 # 01 Y:1992 01 1992 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $125,830 $500,000 Not Implemented
AS0054 # 02 Y:1992 02 1992 USE UTILITY CONTROLLED POWER MANAGEMENT $12,703 $25,000 Implemented
AS0054 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,278 $18,136 Implemented