IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0429 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $711 $2,806 Not Implemented
NC0022 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,088 $90 Implemented
NC0022 # 02 Y:1994 02 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $309 $10 Implemented
NC0022 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,432 $1,592 Implemented
NC0022 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,119 $9,280 Not Implemented
NC0022 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $145 $500 Not Implemented
SD0081 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,532 $8,570 Not Implemented
SD0081 # 02 Y:1994 02 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,629 $500 Not Implemented
SD0081 # 03 Y:1994 03 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $210 $750 Not Implemented
SD0081 # 04 Y:1994 04 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $528 $95 Not Implemented
SD0081 # 05 Y:1994 05 1994 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $14,721 $800 Not Implemented
SD0081 # 06 Y:1994 06 1994 RECOVER WASTE HEAT FROM EQUIPMENT $5,357 $11,600 Not Implemented
SD0081 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,089 $13,406 Not Implemented
SD0081 # 08 Y:1994 08 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $599 $60 Not Implemented
SD0081 # 09 Y:1994 09 1994 INSTALL SPECTRAL REFLECTORS / DELAMP $1,313 $2,705 Not Implemented
SD0081 # 10 Y:1994 10 1994 INSTALL OCCUPANCY SENSORS $1,343 $3,680 Not Implemented
WV0029 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,087 $1,173 Implemented
WV0029 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $461 $14,040 Not Implemented
WV0029 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $475 $300 Implemented
WV0029 # 04 Y:1994 04 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $279 $0 Implemented
WV0029 # 05 Y:1994 05 1994 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $4,413 $340 Not Implemented
WV0029 # 06 Y:1994 06 1994 INSULATE BARE EQUIPMENT $12,889 $3,360 Not Implemented
WV0029 # 07 Y:1994 07 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $192 $15 Implemented
WV0029 # 08 Y:1994 08 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $216 $303 Implemented
WV0029 # 09 Y:1994 09 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $11,134 $4,830 Not Implemented