Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,821
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0541 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,345 | $4,836 | Not Implemented |
LE0541 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,586 | $8,304 | Not Implemented |
WM0193 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,222 | $2,031 | Not Implemented |
WM0193 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,952 | $4,375 | Implemented |
WM0193 # 03 Y:2023 | 03 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $323 | $1,360 | Implemented |
WM0193 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $286 | $500 | Implemented |
WM0193 # 05 Y:2023 | 05 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $266 | $732 | Not Implemented |
WM0193 # 06 Y:2023 | 06 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $201 | $380 | Not Implemented |
NL0077 # 01 Y:2023 | 01 | 2023 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $150,762 | $690,000 | Not Implemented |
NL0077 # 02 Y:2023 | 02 | 2023 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $121,895 | $4,200 | Implemented |
NL0077 # 03 Y:2023 | 03 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $36,689 | $350 | Not Implemented |
NL0077 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,279 | $4,500 | Implemented |
NL0077 # 05 Y:2023 | 05 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,997 | $470 | Not Implemented |
NL0077 # 06 Y:2023 | 06 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $527 | $200 | Implemented |
NT0001 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,144 | $5,801 | Implemented |
NT0001 # 02 Y:2023 | 02 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $16,452 | $9,984 | Implemented |
NT0001 # 03 Y:2023 | 03 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,130 | $1,258 | Implemented |
NT0001 # 04 Y:2023 | 04 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $19,448 | $9,020 | Not Implemented |
NT0001 # 05 Y:2023 | 05 | 2023 | INSTALL SET-BACK TIMERS | $883 | $0 | Implemented |
NT0001 # 06 Y:2023 | 06 | 2023 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $2,710 | $0 | Implemented |
NT0001 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,707 | $6,472 | Implemented |
UF0589 # 09 Y:2023 | 09 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,438 | $0 | Implemented |
UF0589 # 10 Y:2023 | 10 | 2023 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $5,304 | $4,300 | Implemented |
UF0589 # 11 Y:2023 | 11 | 2023 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $4,770 | $2,800 | Implemented |
UF0589 # 12 Y:2023 | 12 | 2023 | INSTALL TURBULATORS | $4,595 | $7,500 | Implemented |