IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,130

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0167 # 01 Y:1993 01 1993 SHUT OFF PILOTS IN STANDBY EQUIPMENT $28,100 $0 Implemented
AM0167 # 02 Y:1993 02 1993 OPTIMIZE PLANT POWER FACTOR $10,100 $16,000 Implemented
AM0167 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,720 $4,400 Implemented
AM0167 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,610 $4,900 Implemented
AM0167 # 05 Y:1993 05 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $2,970 $2,450 Not Implemented
AM0167 # 06 Y:1993 06 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,290 $0 Not Implemented
IA0045 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,690 $660 Implemented
IA0045 # 02 Y:1993 02 1993 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,118 $1,188 Not Implemented
IA0045 # 03 Y:1993 03 1993 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $4,196 $2,893 Implemented
IA0045 # 04 Y:1993 04 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,763 $714 Not Implemented
IA0045 # 05 Y:1993 05 1993 INSTALL OCCUPANCY SENSORS $2,302 $1,215 Not Implemented
IA0046 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,020 $50 Implemented
IA0046 # 02 Y:1993 02 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,060 $150 Implemented
IA0046 # 03 Y:1993 03 1993 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $1,563 $3,800 Not Implemented
IA0046 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $942 $125 Implemented
IA0046 # 05 Y:1993 05 1993 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $22 $20 Implemented
WI0167 # 01 Y:1993 01 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,003 $12,000 n/a
WI0167 # 02 Y:1993 02 1993 CONSIDER THREE OR FOUR DAYS AROUND-THE-CLOCK OPERATION RATHER THAN ONE OR TWO SHIFTS PER DAY $12,067 $0 n/a
WI0167 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,860 $7,472 n/a
WI0167 # 04 Y:1993 04 1993 INSTALL OCCUPANCY SENSORS $1,303 $600 n/a
WI0167 # 05 Y:1993 05 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $1,505 $0 n/a
WI0167 # 06 Y:1993 06 1993 RECOVER WASTE HEAT FROM EQUIPMENT $1,275 $1,500 n/a
WI0167 # 07 Y:1993 07 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,058 $1,280 n/a
WI0167 # 08 Y:1993 08 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $763 $500 n/a
WI0167 # 09 Y:1993 09 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $285 $1,000 n/a