IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,314

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0023 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,633 $440 Not Implemented
AS0023 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,629 $2,688 Not Implemented
AS0023 # 05 Y:1991 05 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,762 $0 Not Implemented
AS0023 # 06 Y:1991 06 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,767 $14,294 Not Implemented
AS0023 # 07 Y:1991 07 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,589 $0 Not Implemented
AS0023 # 08 Y:1991 08 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,627 $1,200 Not Implemented
AS0023 # 09 Y:1991 09 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,165 $2,000 Not Implemented
AS0023 # 10 Y:1991 10 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,543 $2,000 Not Implemented
AS0023 # 11 Y:1991 11 1991 IMPROVE LUBRICATION PRACTICES $1,470 $5,122 Not Implemented
AS0023 # 12 Y:1991 12 1991 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $4,237 $6,400 Not Implemented
AS0024 # 01 Y:1991 01 1991 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $38,440 $125,000 Implemented
AS0024 # 02 Y:1991 02 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,565 $9,500 Implemented
AS0024 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,981 $395 Implemented
AS0024 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $428 $407 Implemented
AS0024 # 05 Y:1991 05 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,865 $0 Implemented
AS0024 # 06 Y:1991 06 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $231 $277 Implemented
AS0024 # 07 Y:1991 07 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,414 $0 Implemented
AS0024 # 08 Y:1991 08 1991 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $3,287 $900 Implemented
AS0024 # 09 Y:1991 09 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,962 $2,000 Implemented
AS0025 # 01 Y:1991 01 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,398 $10,675 Not Implemented
AS0025 # 02 Y:1991 02 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,118 $2,200 Not Implemented
AS0025 # 03 Y:1991 03 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,333 $2,000 Not Implemented
AS0025 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,567 $343 Not Implemented
AS0025 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $264 $518 Not Implemented
AS0025 # 06 Y:1991 06 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,040 $0 Not Implemented