Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
146,354
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1904 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $53,325 | $243,934 | n/a |
UK1904 # 05 Y:2019 | 05 | 2019 | INSTALL SKYLIGHTS | $18,882 | $84,800 | n/a |
UK1904 # 06 Y:2019 | 06 | 2019 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $364 | $1,800 | n/a |
UK1904 # 07 Y:2019 | 07 | 2019 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,714 | $720 | n/a |
UK1904 # 08 Y:2019 | 08 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $64,369 | $260,000 | n/a |
UK1904 # 09 Y:2019 | 09 | 2019 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $854 | $660 | n/a |
UK1904 # 10 Y:2019 | 10 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,940 | $4,150 | n/a |
UK1904 # 11 Y:2019 | 11 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $828 | $1,150 | n/a |
UK1904 # 12 Y:2019 | 12 | 2019 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $986 | $3,960 | n/a |
UK1904 # 13 Y:2019 | 13 | 2019 | INSULATE BARE EQUIPMENT | $481 | $419 | n/a |
UK1904 # 14 Y:2019 | 14 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $40,920 | $180,000 | n/a |
AS0475 # 01 Y:2019 | 01 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,577 | $20,083 | Not Implemented |
AS0475 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,094 | $5,938 | Implemented |
AS0475 # 03 Y:2019 | 03 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,779 | $895 | Implemented |
AS0475 # 04 Y:2019 | 04 | 2019 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $2,515 | $7,906 | Not Implemented |
AS0475 # 05 Y:2019 | 05 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,084 | $1,166 | Not Implemented |
AS0475 # 06 Y:2019 | 06 | 2019 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $411 | $236 | Not Implemented |
AS0475 # 07 Y:2019 | 07 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $159 | $752 | Implemented |
AS0475 # 08 Y:2019 | 08 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $110 | $23 | Not Implemented |
MA0808 # 01 Y:2019 | 01 | 2019 | USE SOLAR HEAT FOR HEAT | $97,263 | $474,397 | Not Implemented |
MA0808 # 02 Y:2019 | 02 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,454 | $12,318 | Implemented |
MA0808 # 03 Y:2019 | 03 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $10,081 | $39,024 | Not Implemented |
MA0808 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,080 | $2,000 | Implemented |
MA0808 # 05 Y:2019 | 05 | 2019 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $2,848 | $500 | Not Implemented |
SF0543 # 01 Y:2019 | 01 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,772 | $757 | Implemented |