IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,289

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0018 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,012 $480 Implemented
NC0018 # 02 Y:1994 02 1994 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $742 $350 Not Implemented
NC0018 # 03 Y:1994 03 1994 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $24,252 $11,500 Implemented
NC0018 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,437 $6,600 Implemented
NC0018 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,509 $1,046 Not Implemented
NC0017 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,058 $3,076 Implemented
NC0017 # 02 Y:1994 02 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,343 $0 Implemented
NC0017 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,354 $10,150 Not Implemented
NC0017 # 04 Y:1994 04 1994 INSULATE BARE EQUIPMENT $9,405 $3,536 Not Implemented
NC0017 # 05 Y:1994 05 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,403 $1,230 Implemented
NC0017 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,366 $750 Implemented
NC0017 # 07 Y:1994 07 1994 USE RADIANT HEATER FOR SPOT HEATING $12,784 $14,500 Implemented
NC0016 # 01 Y:1994 01 1994 INSTALL TURBULATORS $68,797 $3,000 Not Implemented
NC0016 # 02 Y:1994 02 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,812 $15,750 Not Implemented
NC0016 # 03 Y:1994 03 1994 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $5,634 $38,500 Not Implemented
NC0016 # 04 Y:1994 04 1994 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $42,728 $34,300 Not Implemented
NC0016 # 05 Y:1994 05 1994 USE OPTIMUM THICKNESS INSULATION $61,266 $133,293 Not Implemented
NC0016 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,603 $1,000 Not Implemented
NC0016 # 07 Y:1994 07 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,831 $960 Implemented
NC0016 # 08 Y:1994 08 1994 BURN A LESS EXPENSIVE GRADE OF FUEL $40,563 $118,090 Not Implemented
NC0012 # 01 Y:1993 01 1993 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $14,358 $14,233 Not Implemented
NC0012 # 02 Y:1993 02 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $27,321 $0 Not Implemented
NC0012 # 03 Y:1993 03 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,032 $4,500 Implemented
NC0012 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,829 $510 Implemented
NC0012 # 05 Y:1993 05 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,454 $500 Implemented