Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,474
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0297 # 03 Y:1994 | 03 | 1994 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $3,339 | $5,980 | Not Implemented |
MA0297 # 04 Y:1994 | 04 | 1994 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $795 | $816 | Implemented |
MA0297 # 05 Y:1994 | 05 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $60 | $594 | Not Implemented |
MA0297 # 06 Y:1994 | 06 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $245 | $0 | Implemented |
OK0427 # 01 Y:1994 | 01 | 1994 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,670 | $5,000 | Implemented |
OK0427 # 02 Y:1994 | 02 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $18,819 | $49,834 | Not Implemented |
OK0427 # 03 Y:1994 | 03 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $13,033 | $34,476 | Not Implemented |
OK0427 # 04 Y:1994 | 04 | 1994 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $11,717 | $1,000 | Not Implemented |
OK0427 # 05 Y:1994 | 05 | 1994 | INSTALL / REPAIR INSULATION ON STEAM LINES | $182 | $193 | Implemented |
NC0020 # 01 Y:1994 | 01 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $410 | $302 | Implemented |
NC0020 # 02 Y:1994 | 02 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,282 | $3,800 | Implemented |
NC0020 # 03 Y:1994 | 03 | 1994 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $17,360 | $2,355 | Not Implemented |
NC0020 # 04 Y:1994 | 04 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $580 | $55 | Implemented |
NC0020 # 05 Y:1994 | 05 | 1994 | INSULATE BARE EQUIPMENT | $4,029 | $338 | Implemented |
NC0020 # 06 Y:1994 | 06 | 1994 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $1,255 | $4,012 | Implemented |
NC0019 # 01 Y:1994 | 01 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,350 | $270 | Implemented |
NC0019 # 02 Y:1994 | 02 | 1994 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,400 | $3,500 | Not Implemented |
NC0019 # 03 Y:1994 | 03 | 1994 | USE POWER DURING OFF-PEAK PERIODS | $7,853 | $0 | Not Implemented |
NC0019 # 04 Y:1994 | 04 | 1994 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $2,311 | $680 | Not Implemented |
NC0019 # 05 Y:1994 | 05 | 1994 | REDUCE VENTILATION AIR | $17,508 | $85,800 | Not Implemented |
ME0125 # 01 Y:1994 | 01 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $416 | $50 | Implemented |
ME0125 # 02 Y:1994 | 02 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,070 | $450 | Implemented |
ME0125 # 03 Y:1994 | 03 | 1994 | TURN OFF EQUIPMENT WHEN NOT IN USE | $763 | $0 | Implemented |
ME0125 # 04 Y:1994 | 04 | 1994 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $951 | $400 | Not Implemented |
ME0125 # 05 Y:1994 | 05 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $634 | $500 | Implemented |