Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,875
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
HO0003 # 04 Y:1991 | 04 | 1991 | PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT | $2,140 | $3,036 | Implemented |
HO0003 # 05 Y:1991 | 05 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $6,280 | $0 | Implemented |
HO0003 # 06 Y:1991 | 06 | 1991 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $779 | $0 | Implemented |
HO0003 # 07 Y:1991 | 07 | 1991 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $457 | $1,500 | Implemented |
HO0004 # 01 Y:1991 | 01 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,070 | $1,021 | Not Implemented |
HO0004 # 02 Y:1991 | 02 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,063 | $667 | Not Implemented |
HO0004 # 03 Y:1991 | 03 | 1991 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $904 | $800 | Not Implemented |
HO0004 # 04 Y:1991 | 04 | 1991 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,695 | $0 | Not Implemented |
HO0004 # 05 Y:1991 | 05 | 1991 | REPAIR AND ELIMINATE STEAM LEAKS | $714 | $50 | Not Implemented |
HO0004 # 06 Y:1991 | 06 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,950 | $1,000 | Not Implemented |
HO0005 # 01 Y:1991 | 01 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,934 | $0 | Implemented |
HO0005 # 02 Y:1991 | 02 | 1991 | INSTALL SET-BACK TIMERS | $557 | $306 | Implemented |
HO0005 # 03 Y:1991 | 03 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,230 | $9,596 | Implemented |
HO0005 # 04 Y:1991 | 04 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $962 | $949 | Implemented |
HO0005 # 05 Y:1991 | 05 | 1991 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $6,879 | $2,000 | Implemented |
HO0005 # 06 Y:1991 | 06 | 1991 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $450 | $0 | Implemented |
HO0005 # 07 Y:1991 | 07 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,823 | $250 | Implemented |
HO0006 # 01 Y:1991 | 01 | 1991 | KEEP LAMPS AND REFLECTORS CLEAN | $20,537 | $17,985 | Implemented |
HO0006 # 02 Y:1991 | 02 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,403 | $7,562 | Implemented |
HO0006 # 03 Y:1991 | 03 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,591 | $35,640 | Implemented |
HO0006 # 04 Y:1991 | 04 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $462 | $259 | Implemented |
HO0006 # 05 Y:1991 | 05 | 1991 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $144,397 | $0 | Implemented |
HO0006 # 06 Y:1991 | 06 | 1991 | INSULATE BARE EQUIPMENT | $138 | $173 | Implemented |
HO0006 # 07 Y:1991 | 07 | 1991 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $1,687 | $1,400 | Implemented |
HO0002 # 01 Y:1991 | 01 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $112 | $652 | Implemented |