IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,875

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0091 # 09 Y:1990 09 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $347 $239 Implemented
RU0091 # 10 Y:1990 10 1990 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $946 $402 Implemented
RU0083 # 01 Y:1990 01 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,358 $325 Implemented
RU0083 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,191 $2,368 Implemented
RU0083 # 03 Y:1990 03 1990 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $51,967 $50,000 Not Implemented
RU0083 # 04 Y:1990 04 1990 AIR CONDITION ONLY SPACE NECESSARY $3,851 $6,100 Implemented
RU0083 # 05 Y:1990 05 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,994 $17,800 Not Implemented
RU0083 # 06 Y:1990 06 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $17,662 $0 Implemented
RU0083 # 07 Y:1990 07 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,019 $0 Not Implemented
RU0084 # 01 Y:1990 01 1990 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $68,217 $70,000 Implemented
RU0084 # 02 Y:1990 02 1990 CONSIDER THREE OR FOUR DAYS AROUND-THE-CLOCK OPERATION RATHER THAN ONE OR TWO SHIFTS PER DAY $12,691 $0 Not Implemented
RU0084 # 03 Y:1990 03 1990 USE OPTIMUM THICKNESS INSULATION $4,598 $3,900 Not Implemented
RU0071 # 01 Y:1989 01 1989 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $15,813 $0 Not Implemented
RU0071 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $360 $295 Implemented
RU0071 # 03 Y:1989 03 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $738 $0 Not Implemented
RU0071 # 04 Y:1989 04 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $554 $117 Not Implemented
RU0071 # 05 Y:1989 05 1989 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $3,352 $50 Implemented
RU0071 # 06 Y:1989 06 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,906 $6,800 Not Implemented
RU0071 # 07 Y:1989 07 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,674 $2,700 Not Implemented
RU0071 # 08 Y:1989 08 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,772 $500 Implemented
RU0040 # 01 Y:1988 01 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,115 $412 Implemented
RU0040 # 02 Y:1988 02 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,463 $0 Implemented
RU0040 # 03 Y:1988 03 1988 IMPROVE LUBRICATION PRACTICES $7,613 $4,000 Not Implemented
RU0040 # 04 Y:1988 04 1988 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $150,077 $375,000 Not Implemented
RU0040 # 05 Y:1988 05 1988 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,098 $0 Implemented