Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,875
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
RU0091 # 09 Y:1990 | 09 | 1990 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $347 | $239 | Implemented |
RU0091 # 10 Y:1990 | 10 | 1990 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $946 | $402 | Implemented |
RU0083 # 01 Y:1990 | 01 | 1990 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,358 | $325 | Implemented |
RU0083 # 02 Y:1990 | 02 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,191 | $2,368 | Implemented |
RU0083 # 03 Y:1990 | 03 | 1990 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $51,967 | $50,000 | Not Implemented |
RU0083 # 04 Y:1990 | 04 | 1990 | AIR CONDITION ONLY SPACE NECESSARY | $3,851 | $6,100 | Implemented |
RU0083 # 05 Y:1990 | 05 | 1990 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $14,994 | $17,800 | Not Implemented |
RU0083 # 06 Y:1990 | 06 | 1990 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $17,662 | $0 | Implemented |
RU0083 # 07 Y:1990 | 07 | 1990 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,019 | $0 | Not Implemented |
RU0084 # 01 Y:1990 | 01 | 1990 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $68,217 | $70,000 | Implemented |
RU0084 # 02 Y:1990 | 02 | 1990 | CONSIDER THREE OR FOUR DAYS AROUND-THE-CLOCK OPERATION RATHER THAN ONE OR TWO SHIFTS PER DAY | $12,691 | $0 | Not Implemented |
RU0084 # 03 Y:1990 | 03 | 1990 | USE OPTIMUM THICKNESS INSULATION | $4,598 | $3,900 | Not Implemented |
RU0071 # 01 Y:1989 | 01 | 1989 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $15,813 | $0 | Not Implemented |
RU0071 # 02 Y:1989 | 02 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $360 | $295 | Implemented |
RU0071 # 03 Y:1989 | 03 | 1989 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $738 | $0 | Not Implemented |
RU0071 # 04 Y:1989 | 04 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $554 | $117 | Not Implemented |
RU0071 # 05 Y:1989 | 05 | 1989 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $3,352 | $50 | Implemented |
RU0071 # 06 Y:1989 | 06 | 1989 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,906 | $6,800 | Not Implemented |
RU0071 # 07 Y:1989 | 07 | 1989 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,674 | $2,700 | Not Implemented |
RU0071 # 08 Y:1989 | 08 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,772 | $500 | Implemented |
RU0040 # 01 Y:1988 | 01 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,115 | $412 | Implemented |
RU0040 # 02 Y:1988 | 02 | 1988 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,463 | $0 | Implemented |
RU0040 # 03 Y:1988 | 03 | 1988 | IMPROVE LUBRICATION PRACTICES | $7,613 | $4,000 | Not Implemented |
RU0040 # 04 Y:1988 | 04 | 1988 | REPLACE DC EQUIPMENT WITH AC EQUIPMENT | $150,077 | $375,000 | Not Implemented |
RU0040 # 05 Y:1988 | 05 | 1988 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,098 | $0 | Implemented |