IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,152

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0129 # 04 Y:1982 04 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,387 $872 Not Implemented
GT0134 # 01 Y:1982 01 1982 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $679 $1,900 Not Implemented
GT0134 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,005 $281 Not Implemented
GT0134 # 03 Y:1982 03 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $835 $900 Not Implemented
GT0134 # 04 Y:1982 04 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $204 $200 Implemented
GT0137 # 01 Y:1982 01 1982 USE RADIANT HEATER FOR SPOT HEATING $1,584 $560 Not Implemented
GT0137 # 02 Y:1982 02 1982 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,900 $2,039 Not Implemented
GT0137 # 03 Y:1982 03 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $330 $304 Implemented
GT0138 # 01 Y:1982 01 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $18,635 $5,100 Not Implemented
GT0138 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,685 $1,012 Not Implemented
GT0138 # 03 Y:1982 03 1982 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $12,800 $27,000 Not Implemented
GT0138 # 04 Y:1982 04 1982 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,515 $0 Not Implemented
GT0138 # 05 Y:1982 05 1982 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,467 $1,155 Implemented
GT0138 # 06 Y:1982 06 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,207 $0 Implemented
GT0138 # 07 Y:1982 07 1982 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $628 $3,500 Implemented
UD0044 # 01 Y:1982 01 1982 CHECK FOR ACCURACY OF UTILITY / POWER METERS $4,962 $2,000 Not Implemented
UD0045 # 01 Y:1982 01 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $229 $400 Implemented
UD0045 # 02 Y:1982 02 1982 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $4,586 $7,000 Implemented
UD0045 # 03 Y:1982 03 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,451 $3,100 Implemented
UD0046 # 01 Y:1982 01 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $595 $0 Not Implemented
UD0046 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,862 $60,027 Not Implemented
UD0046 # 03 Y:1982 03 1982 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,172 $500 Not Implemented
UD0046 # 04 Y:1982 04 1982 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,794 $900 Not Implemented
TN0129 # 01 Y:1982 01 1982 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $19,550 $11,600 Not Implemented
TN0129 # 02 Y:1982 02 1982 INSULATE BARE EQUIPMENT $2,797 $3,200 Not Implemented