IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0223 # 05 Y:2000 05 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $437 $0 Implemented
HO0223 # 06 Y:2000 06 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,732 $1,400 Not Implemented
HO0223 # 07 Y:2000 07 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,692 $400 Implemented
HO0223 # 08 Y:2000 08 2000 AIR CONDITION ONLY SPACE NECESSARY $5,049 $300 Implemented
HO0223 # 09 Y:2000 09 2000 $7,193 $20,000 Not Implemented
HO0223 # 10 Y:2000 10 2000 $2,400 $2,600 Implemented
HO0223 # 11 Y:2000 11 2000 $4,200 $0 Implemented
HO0223 # 12 Y:2000 12 2000 $1,260 $200 Implemented
HO0223 # 13 Y:2000 13 2000 USE A DIFFERENT OR RECYCLED RAW MATERIAL $1,273 $0 Implemented
ME0284 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,752 $16,593 Not Implemented
ME0284 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,586 $8,987 Implemented
ME0284 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,090 $15,253 Implemented
ME0284 # 04 Y:2000 04 2000 BURN A LESS EXPENSIVE GRADE OF FUEL $2,969 $250 Not Implemented
ME0284 # 05 Y:2000 05 2000 MINIMIZE WATER USAGE $992 $105 Not Implemented
BD0155 # 01 Y:2000 01 2000 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $30,413 $85,000 Not Implemented
BD0155 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $7,453 $2,325 Implemented
BD0155 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $6,932 $5,768 Not Implemented
BD0155 # 04 Y:2000 04 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,322 $7,130 Implemented
BD0155 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,686 $3,137 Implemented
BD0155 # 06 Y:2000 06 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,218 $600 Not Implemented
BD0155 # 07 Y:2000 07 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,202 $3,000 Not Implemented
BD0155 # 08 Y:2000 08 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,113 $495 Implemented
BD0155 # 09 Y:2000 09 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $66,016 $8,000 Not Implemented
BD0155 # 10 Y:2000 10 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $41,518 $8,000 Not Implemented
BD0155 # 11 Y:2000 11 2000 $29,751 $0 Implemented