IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,723

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0328 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,031 $0 Implemented
UF0328 # 06 Y:2003 06 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,039 $5,141 Not Implemented
UF0328 # 07 Y:2003 07 2003 IMPROVE SPACE COMFORT CONDITIONING $3,900 $4,000 Implemented
UF0327 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,630 $0 Implemented
UF0327 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,198 $0 Implemented
UF0327 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $985 $5,476 Implemented
UF0327 # 04 Y:2003 04 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,892 $10,175 Implemented
UF0327 # 05 Y:2003 05 2003 ADD AREA LIGHTING SWITCHES $984 $4,290 Not Implemented
UF0327 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,991 $376 Implemented
UF0327 # 07 Y:2003 07 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $39,320 $10,726 Not Implemented
UF0327 # 08 Y:2003 08 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $21,592 $110,000 Implemented
UF0327 # 09 Y:2003 09 2003 INSTALL EQUIPMENT TO MOVE PRODUCT $15,228 $5,300 Implemented
UF0327 # 10 Y:2003 10 2003 INSTALL SYSTEM TO COLLECT SCRAP $7,800 $780 Implemented
UF0327 # 11 Y:2003 11 2003 IMPROVE SPACE COMFORT CONDITIONING $26,498 $49,051 Not Implemented
UF0326 # 01 Y:2003 01 2003 DIRECT WARMEST AIR TO COMBUSTION INTAKE $136,220 $60,000 Not Implemented
UF0326 # 02 Y:2003 02 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,941 $1,860 Not Implemented
UF0326 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,007 $3,682 Not Implemented
UF0326 # 04 Y:2003 04 2003 INSTALL STEAM TRAP $5,631 $238 Implemented
UF0326 # 05 Y:2003 05 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $13,967 $8,000 Not Implemented
UF0326 # 06 Y:2003 06 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,783 $0 Implemented
UF0326 # 07 Y:2003 07 2003 INSTALL AUTOMATIC PACKING EQUIPMENT $48,872 $32,000 Not Implemented
UF0325 # 01 Y:2003 01 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,804 $0 Implemented
UF0325 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,190 $6,999 Not Implemented
UF0325 # 03 Y:2003 03 2003 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $16,751 $9,663 Implemented
UF0325 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,308 $550 Not Implemented