IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,875

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0009 # 02 Y:1987 02 1987 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $410 $125 Not Implemented
RU0009 # 03 Y:1987 03 1987 IMPROVE LUBRICATION PRACTICES $1,609 $1,600 Implemented
RU0009 # 04 Y:1987 04 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,243 $0 Implemented
RU0009 # 05 Y:1987 05 1987 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $140 $300 Not Implemented
RU0009 # 06 Y:1987 06 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,540 $279 Implemented
RU0010 # 01 Y:1987 01 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $556 $400 Not Implemented
RU0010 # 02 Y:1987 02 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $600 $0 Implemented
RU0010 # 03 Y:1987 03 1987 IMPROVE LUBRICATION PRACTICES $120 $0 Implemented
RU0010 # 04 Y:1987 04 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12 $0 Implemented
RU0010 # 05 Y:1987 05 1987 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $696 $450 Implemented
RU0010 # 06 Y:1987 06 1987 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,458 $2,250 Not Implemented
RU0010 # 07 Y:1987 07 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $654 $316 Not Implemented
ST0074 # 01 Y:1986 01 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,553 $0 Implemented
ST0074 # 02 Y:1986 02 1986 RECOVER WASTE HEAT FROM EQUIPMENT $10,364 $6,000 Not Implemented
ST0074 # 03 Y:1986 03 1986 USE OPTIMUM THICKNESS INSULATION $1,489 $1,500 Implemented
ST0074 # 04 Y:1986 04 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,008 $3,000 Not Implemented
ST0074 # 05 Y:1986 05 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,074 $1,050 Not Implemented
ST0074 # 06 Y:1986 06 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $125,108 $160,000 Implemented
ST0075 # 01 Y:1986 01 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,355 $0 Implemented
ST0075 # 02 Y:1986 02 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $130 $400 Implemented
ST0075 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,137 $537 Implemented
ST0075 # 04 Y:1986 04 1986 INCREASE AMOUNT OF CONDENSATE RETURNED $78,667 $20,000 Not Implemented
ST0075 # 05 Y:1986 05 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,765 $3,667 Not Implemented
ST0075 # 06 Y:1986 06 1986 INSTALL TIMERS AND/OR THERMOSTATS $1,976 $600 Not Implemented
ST0075 # 07 Y:1986 07 1986 REPAIR OR REPLACE STEAM TRAPS $6,449 $500 Implemented