Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,925
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0565 # 01 Y:2024 | 01 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,336 | $0 | n/a |
SU0565 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,849 | $329 | n/a |
SU0563 # 02 Y:2024 | 02 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $14,283 | $0 | n/a |
SU0563 # 07 Y:2024 | 07 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,332 | $2,425 | n/a |
SU0563 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,490 | $0 | n/a |
SU0563 # 05 Y:2024 | 05 | 2024 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $2,466 | $1,340 | n/a |
SU0563 # 09 Y:2024 | 09 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $40,498 | $249,040 | n/a |
SU0563 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,793 | $40,140 | n/a |
SU0563 # 11 Y:2024 | 11 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $57,940 | $773,422 | n/a |
SU0563 # 03 Y:2024 | 03 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $488 | $40 | n/a |
SU0563 # 10 Y:2024 | 10 | 2024 | USE HEAT PUMP FOR SPACE CONDITIONING | $10,607 | $70,800 | n/a |
SU0563 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,699 | $660 | n/a |
SU0563 # 08 Y:2024 | 08 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $328 | $1,597 | n/a |
SU0562 # 10 Y:2024 | 10 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $291 | $1,234 | n/a |
SU0562 # 09 Y:2024 | 09 | 2024 | INSULATE BARE EQUIPMENT | $639 | $2,272 | n/a |
SU0562 # 04 Y:2024 | 04 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $3,064 | $120 | n/a |
SU0562 # 06 Y:2024 | 06 | 2024 | INSTALL BACK-UP EQUIPMENT | $75,000 | $86,000 | n/a |
SU0562 # 08 Y:2024 | 08 | 2024 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $25,000 | $80,000 | n/a |
SU0562 # 03 Y:2024 | 03 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $656 | $0 | n/a |
SU0562 # 05 Y:2024 | 05 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $374 | $418 | n/a |
SU0562 # 02 Y:2024 | 02 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,090 | $0 | n/a |
SU0562 # 11 Y:2024 | 11 | 2024 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $437 | $2,900 | n/a |
SU0562 # 01 Y:2024 | 01 | 2024 | DISCONNECT BALLASTS | $526 | $0 | n/a |
SU0562 # 07 Y:2024 | 07 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $419 | $632 | n/a |
SU0562 # 12 Y:2024 | 12 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $36,470 | $266,289 | n/a |