IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,666

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0808 # 22 Y:2009 22 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,305 $18,884 Not Implemented
UD0808 # 06 Y:2009 06 2009 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $67,977 $135,954 Not Implemented
SD0423 # 03 Y:2009 03 2009 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $19,013 $4,062 Not Implemented
SD0423 # 07 Y:2009 07 2009 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $217,707 $718,800 Not Implemented
UD0808 # 12 Y:2009 12 2009 UPGRADE CONTROLS ON COMPRESSORS $17,167 $0 Not Implemented
UD0808 # 16 Y:2009 16 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,446 $1,000 Implemented
SD0423 # 05 Y:2009 05 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,107 $5,200 Not Implemented
MZ0045 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,645 $0 Implemented
MZ0045 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,734 $950 Implemented
MZ0045 # 05 Y:2009 05 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $23,660 $0 Implemented
MZ0045 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,876 $46,050 Implemented
MZ0045 # 02 Y:2009 02 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,746 $4,200 Not Implemented
MZ0044 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,600 $850 Implemented
LL0324 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,689 $1,050 Not Implemented
LL0324 # 01 Y:2009 01 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $51,066 $5,850 Implemented
MZ0044 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,991 $38,600 Implemented
MZ0044 # 07 Y:2009 07 2009 RECOVER WASTE HEAT FROM EQUIPMENT $11,155 $10,000 Not Implemented
MZ0044 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,268 $0 Not Implemented
MZ0044 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,160 $5,600 Implemented
LL0324 # 02 Y:2009 02 2009 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $3,552 $1,140 Not Implemented
LL0324 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $158 $1,435 Not Implemented
LL0324 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,908 $265 Not Implemented
LL0324 # 06 Y:2009 06 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $258 $120 Not Implemented
MZ0044 # 06 Y:2009 06 2009 RECOVER WASTE HEAT FROM EQUIPMENT $15,312 $10,000 Not Implemented
LL0324 # 08 Y:2009 08 2009 INSTALL OCCUPANCY SENSORS $142 $270 Not Implemented