IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,283

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AT0050 # 01 Y:1986 01 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $859 $400 Implemented
AT0050 # 02 Y:1986 02 1986 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $6,892 $1,700 Not Implemented
AT0050 # 03 Y:1986 03 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,822 $20,000 Not Implemented
AT0050 # 04 Y:1986 04 1986 RECOVER WASTE HEAT FROM EQUIPMENT $361 $300 Not Implemented
AT0050 # 05 Y:1986 05 1986 REDUCE VENTILATION AIR $8,542 $203 Not Implemented
AT0043 # 01 Y:1986 01 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $853 $3,046 Implemented
AT0043 # 02 Y:1986 02 1986 INSULATE BARE EQUIPMENT $957 $150 Not Implemented
AT0043 # 03 Y:1986 03 1986 IMPROVE LUBRICATION PRACTICES $11,298 $0 Implemented
AT0043 # 04 Y:1986 04 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $470 $150 Implemented
AT0044 # 01 Y:1986 01 1986 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,139 $3,000 Implemented
AT0044 # 02 Y:1986 02 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,956 $300 Implemented
AT0044 # 03 Y:1986 03 1986 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $1,314 $2,000 Not Implemented
AT0044 # 04 Y:1986 04 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,618 $250 Not Implemented
AT0044 # 05 Y:1986 05 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,115 $1,800 Implemented
AT0045 # 01 Y:1986 01 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,281 $4,444 Implemented
AT0045 # 02 Y:1986 02 1986 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $12,817 $2,000 Not Implemented
AT0045 # 03 Y:1986 03 1986 INSULATE BARE EQUIPMENT $2,194 $100 Implemented
AT0045 # 04 Y:1986 04 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $78,041 $50,000 Implemented
AT0045 # 05 Y:1986 05 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,209 $5,000 Implemented
AT0045 # 06 Y:1986 06 1986 AIR CONDITION ONLY SPACE NECESSARY $724 $2,000 Implemented
AT0046 # 01 Y:1986 01 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $593 $159 Implemented
AT0046 # 02 Y:1986 02 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,844 $1,000 Implemented
AT0046 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,530 $3,300 Not Implemented
AT0046 # 04 Y:1986 04 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,268 $250 Implemented
AT0046 # 05 Y:1986 05 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,854 $2,500 Not Implemented