IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,713

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0305 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,910 $0 Implemented
UF0305 # 06 Y:2002 06 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,207 $4,727 Not Implemented
UF0305 # 07 Y:2002 07 2002 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $70,992 $25,725 Not Implemented
UF0305 # 08 Y:2002 08 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,340 $1,740 Not Implemented
MI0046 # 01 Y:2002 01 2002 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $74,250 $5,460 Not Implemented
MI0046 # 02 Y:2002 02 2002 INSTALL BACK-UP EQUIPMENT $27,428 $936 Implemented
MI0046 # 03 Y:2002 03 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,162 $1,016 Implemented
MI0046 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,120 $1,068 Implemented
MI0046 # 05 Y:2002 05 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $7,998 $8 Implemented
MI0045 # 01 Y:2002 01 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $315,000 $75,000 Implemented
MI0045 # 02 Y:2002 02 2002 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $20,280 $650 Implemented
MI0045 # 03 Y:2002 03 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,814 $5,700 Implemented
MI0045 # 04 Y:2002 04 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,500 $7 Not Implemented
MI0045 # 05 Y:2002 05 2002 ADD AREA LIGHTING SWITCHES $2,961 $1,550 Not Implemented
UF0303 # 01 Y:2002 01 2002 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $23,984 $1,074 Not Implemented
UF0303 # 02 Y:2002 02 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $6,229 $358 Implemented
UF0303 # 03 Y:2002 03 2002 OPTIMIZE PLANT POWER FACTOR $5,340 $24,092 Implemented
UF0303 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,157 $29,907 n/a
UF0303 # 05 Y:2002 05 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $138,554 $77,000 Not Implemented
UF0303 # 06 Y:2002 06 2002 USE EVAPORATION TO CONCENTRATE MATERIAL $13,509 $4,995 Implemented
UF0303 # 07 Y:2002 07 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $89,796 $0 Not Implemented
UF0303 # 08 Y:2002 08 2002 PAY UTILITY BILLS ON TIME $7,393 $0 Implemented
MI0044 # 01 Y:2002 01 2002 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $180,000 $60 Not Implemented
MI0044 # 02 Y:2002 02 2002 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $39,270 $28,000 Not Implemented
MI0044 # 03 Y:2002 03 2002 INSTALL BACK-UP EQUIPMENT $12,320 $2,534 Not Implemented