IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0152 # 09 Y:1995 09 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $300 $400 Implemented
ME0152 # 10 Y:1995 10 1995 MINIMIZE WATER USAGE $6,411 $2,650 Implemented
ME0152 # 11 Y:1995 11 1995 MINIMIZE WATER USAGE $5,469 $3,812 Implemented
ME0152 # 12 Y:1995 12 1995 MINIMIZE WATER USAGE $1,940 $450 Not Implemented
SD0108 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,729 $4,910 Implemented
SD0108 # 02 Y:1995 02 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,762 $14,570 Not Implemented
SD0108 # 03 Y:1995 03 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $938 $920 Not Implemented
SD0108 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,423 $45,026 Not Implemented
SD0108 # 05 Y:1995 05 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $2,269 $3,995 Not Implemented
SD0108 # 06 Y:1995 06 1995 INSTALL OCCUPANCY SENSORS $833 $1,026 Not Implemented
SD0108 # 07 Y:1995 07 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $23,250 $2,000 Not Implemented
OR0227 # 01 Y:1995 01 1995 RECOVER WASTE HEAT FROM EQUIPMENT $1,632 $935 Implemented
OR0227 # 02 Y:1995 02 1995 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,991 $250 Implemented
OR0227 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $932 $1,184 Implemented
OR0227 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,482 $12,000 Not Implemented
OR0227 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $57 $329 Implemented
OR0227 # 06 Y:1995 06 1995 RECOVER AND REUSE COOLING WATER $6,300 $5,200 Implemented
OR0227 # 07 Y:1995 07 1995 USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS $98,000 $1,180,000 Not Implemented
NC0048 # 01 Y:1995 01 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,504 $0 Not Implemented
NC0048 # 02 Y:1995 02 1995 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $112 $100 Not Implemented
NC0048 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $195 $38 Not Implemented
NC0048 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $589 $180 Not Implemented
NC0048 # 05 Y:1995 05 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,762 $1,000 Not Implemented
NC0048 # 06 Y:1995 06 1995 INSULATE BARE EQUIPMENT $2,212 $6,061 Not Implemented
AS0140 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,420 $22,151 Not Implemented