IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,642

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0204 # 06 Y:1986 06 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $335 $0 Implemented
KU0204 # 07 Y:1986 07 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $732 $30 Implemented
KU0204 # 08 Y:1986 08 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $576 $50 Implemented
KU0204 # 09 Y:1986 09 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $155 $100 Implemented
KU0204 # 10 Y:1986 10 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $126 $0 Not Implemented
KU0205 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,437 $2,317 Implemented
KU0205 # 02 Y:1986 02 1986 INSTALL TIMERS AND/OR THERMOSTATS $3,717 $1,000 Implemented
KU0205 # 03 Y:1986 03 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,773 $150 Implemented
KU0205 # 04 Y:1986 04 1986 IMPROVE LUBRICATION PRACTICES $1,162 $615 Not Implemented
KU0205 # 05 Y:1986 05 1986 INSTALL AUTOMATIC STACK DAMPER $1,085 $1,500 Not Implemented
KU0205 # 06 Y:1986 06 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $648 $0 Implemented
KU0205 # 07 Y:1986 07 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $396 $0 Not Implemented
KU0201 # 01 Y:1986 01 1986 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,771 $5,500 Not Implemented
KU0201 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,677 $1,581 Implemented
KU0201 # 03 Y:1986 03 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,483 $120 Implemented
KU0201 # 04 Y:1986 04 1986 IMPROVE LUBRICATION PRACTICES $1,460 $2,135 Implemented
KU0201 # 05 Y:1986 05 1986 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $1,243 $90 Implemented
KU0201 # 06 Y:1986 06 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,118 $2,100 Not Implemented
KU0201 # 07 Y:1986 07 1986 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $740 $10 Implemented
KU0201 # 08 Y:1986 08 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $173 $1,500 Not Implemented
KU0201 # 09 Y:1986 09 1986 SHUT OFF PILOTS IN STANDBY EQUIPMENT $590 $0 Implemented
KU0201 # 10 Y:1986 10 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $480 $50 Not Implemented
KU0201 # 11 Y:1986 11 1986 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $155 $0 Implemented
KU0201 # 12 Y:1986 12 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $177 $200 Implemented
KU0201 # 13 Y:1986 13 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $138 $0 Implemented