Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,642
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0204 # 06 Y:1986 | 06 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $335 | $0 | Implemented |
KU0204 # 07 Y:1986 | 07 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $732 | $30 | Implemented |
KU0204 # 08 Y:1986 | 08 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $576 | $50 | Implemented |
KU0204 # 09 Y:1986 | 09 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $155 | $100 | Implemented |
KU0204 # 10 Y:1986 | 10 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $126 | $0 | Not Implemented |
KU0205 # 01 Y:1986 | 01 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,437 | $2,317 | Implemented |
KU0205 # 02 Y:1986 | 02 | 1986 | INSTALL TIMERS AND/OR THERMOSTATS | $3,717 | $1,000 | Implemented |
KU0205 # 03 Y:1986 | 03 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,773 | $150 | Implemented |
KU0205 # 04 Y:1986 | 04 | 1986 | IMPROVE LUBRICATION PRACTICES | $1,162 | $615 | Not Implemented |
KU0205 # 05 Y:1986 | 05 | 1986 | INSTALL AUTOMATIC STACK DAMPER | $1,085 | $1,500 | Not Implemented |
KU0205 # 06 Y:1986 | 06 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $648 | $0 | Implemented |
KU0205 # 07 Y:1986 | 07 | 1986 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $396 | $0 | Not Implemented |
KU0201 # 01 Y:1986 | 01 | 1986 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,771 | $5,500 | Not Implemented |
KU0201 # 02 Y:1986 | 02 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,677 | $1,581 | Implemented |
KU0201 # 03 Y:1986 | 03 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,483 | $120 | Implemented |
KU0201 # 04 Y:1986 | 04 | 1986 | IMPROVE LUBRICATION PRACTICES | $1,460 | $2,135 | Implemented |
KU0201 # 05 Y:1986 | 05 | 1986 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $1,243 | $90 | Implemented |
KU0201 # 06 Y:1986 | 06 | 1986 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,118 | $2,100 | Not Implemented |
KU0201 # 07 Y:1986 | 07 | 1986 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $740 | $10 | Implemented |
KU0201 # 08 Y:1986 | 08 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $173 | $1,500 | Not Implemented |
KU0201 # 09 Y:1986 | 09 | 1986 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $590 | $0 | Implemented |
KU0201 # 10 Y:1986 | 10 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $480 | $50 | Not Implemented |
KU0201 # 11 Y:1986 | 11 | 1986 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $155 | $0 | Implemented |
KU0201 # 12 Y:1986 | 12 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $177 | $200 | Implemented |
KU0201 # 13 Y:1986 | 13 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $138 | $0 | Implemented |