IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,521

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0112 # 04 Y:1982 04 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,125 $1,500 Implemented
GT0112 # 05 Y:1982 05 1982 USE OPTIMUM THICKNESS INSULATION $3,585 $5,294 Implemented
GT0112 # 06 Y:1982 06 1982 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,835 $0 Implemented
GT0112 # 07 Y:1982 07 1982 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $656 $0 Implemented
GT0112 # 08 Y:1982 08 1982 RECOVER WASTE HEAT FROM EQUIPMENT $27,024 $31,500 Implemented
GT0112 # 09 Y:1982 09 1982 BURN WASTE PAPER FOR HEAT $106,600 $200,000 Not Implemented
GT0113 # 01 Y:1982 01 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,711 $600 Not Implemented
GT0113 # 02 Y:1982 02 1982 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,811 $1,258 Not Implemented
GT0113 # 03 Y:1982 03 1982 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,406 $50,000 Not Implemented
GT0113 # 04 Y:1982 04 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,896 $90,825 Not Implemented
GT0114 # 01 Y:1982 01 1982 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $6,834 $0 Not Implemented
GT0114 # 02 Y:1982 02 1982 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $2,795 $500 Not Implemented
GT0114 # 03 Y:1982 03 1982 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $1,049 $2,500 Not Implemented
GT0114 # 04 Y:1982 04 1982 RECOVER WASTE HEAT FROM EQUIPMENT $24,416 $48,000 Not Implemented
GT0110 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $160 $154 Not Implemented
GT0110 # 02 Y:1982 02 1982 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $842 $1,110 Implemented
GT0110 # 03 Y:1982 03 1982 LOWER CEILING TO REDUCE CONDITIONED SPACE $2,455 $3,730 Implemented
GT0110 # 04 Y:1982 04 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,087 $5,383 Not Implemented
GT0111 # 01 Y:1982 01 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $814 $0 Implemented
GT0111 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,092 $597 Implemented
GT0111 # 03 Y:1982 03 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $125 $25 Implemented