IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,703

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0696 # 02 Y:2014 02 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,140 $500 Implemented
CO0696 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,870 $6,360 Not Implemented
CO0696 # 04 Y:2014 04 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $310 $480 Implemented
CO0695 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,330 $3,000 Implemented
CO0695 # 02 Y:2014 02 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $640 $1,540 Not Implemented
CO0695 # 03 Y:2014 03 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $20,810 $50 Implemented
CO0695 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,250 $23,365 Implemented
SD0491 # 01 Y:2014 01 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,862 $5,500 Not Implemented
SD0491 # 02 Y:2014 02 2014 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,726 $194 Not Implemented
SD0491 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $924 $3,450 Not Implemented
SD0491 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $609 $957 Not Implemented
SD0491 # 05 Y:2014 05 2014 USE PHOTOCELL CONTROLS $445 $555 Not Implemented
SD0491 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $310 $200 Implemented
MI0268 # 01 Y:2014 01 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $139,206 $330,000 Not Implemented
MI0268 # 02 Y:2014 02 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $70,433 $80 Not Implemented
MI0268 # 03 Y:2014 03 2014 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $58,931 $93,833 Not Implemented
MI0268 # 04 Y:2014 04 2014 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $47,940 $1,400 Not Implemented
MI0268 # 05 Y:2014 05 2014 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $33,525 $8,960 Not Implemented
MI0268 # 06 Y:2014 06 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $33,490 $80 Not Implemented
MI0268 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,776 $62,320 Not Implemented
MI0268 # 08 Y:2014 08 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $27,155 $33,600 Not Implemented
MI0268 # 09 Y:2014 09 2014 ISOLATE HOT OR COLD EQUIPMENT $22,002 $26,830 Not Implemented
MI0268 # 10 Y:2014 10 2014 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $18,560 $640 Not Implemented
MI0268 # 11 Y:2014 11 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,297 $1,660 Not Implemented
MI0268 # 12 Y:2014 12 2014 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $7,749 $800 Not Implemented